Decree 861 with the latest. Rules for the technological connection of power receiving devices (power plants) of legal entities and individuals to electric networks

Rules for access to electricity transmission services - Russian newspaper. In order to promote the development of competition in the market for the production and sale of electrical energy, to protect the rights of consumers of electrical energy and in accordance with Articles 2. federal law.

Approve the attached: Rules for non-discriminatory access to electricity transmission services and provision of these services; Rules for non-discriminatory access to services for operational dispatch control in the electric power industry and the provision of these services; Rules for non-discriminatory access to the services of the wholesale market trading system administrator and the provision of these services; Rules for the technological connection of power receiving devices (power plants) of legal entities and individuals to electric networks. Designate the Federal Antimonopoly Service as the authorized federal executive body to ensure state control over compliance with the Rules for Non-Discriminatory Access to Electricity Transmission Services, Operational and Dispatching Management Services in the Electricity Industry, and Trading System Administrator Services. The Ministry of Industry and Energy of the Russian Federation within 3 months to develop and approve a methodology for determining the normative and actual losses of electrical energy in electrical networks. Prime Minister. Russian Federation. M. Fradkov. Rules for non-discriminatory access to electricity transmission services and the provision of these services. I. General provisions.

These Rules define the general principles and procedure for ensuring non-discriminatory access to electricity transmission services, as well as the provision of these services. The terms used in these Rules mean the following.

Non-discriminatory access to electricity transmission services provides for equal conditions for the provision of these services to their consumers, regardless of the organizational and legal form and legal relations with the person providing these services. Grid organizations are required to disclose information regarding access to electricity transmission services and the provision of these services in accordance with the standards for information disclosure by wholesale and retail electricity market entities. These Rules do not apply to relations related to the provision of intersystem electrical connections, unless otherwise provided by the legislation of the Russian Federation. Services for the transmission of electrical energy are provided by the grid organization on the basis of an agreement on the provision of paid services for the transmission of electrical energy to persons who have, on the right of ownership or on another legal basis, power receiving devices and other objects of the electric power industry, technologically connected in the prescribed manner to the electrical network, as well as wholesalers electricity market, exporting (importing) electricity, energy sales organizations and guaranteeing suppliers. The grid organization, in fulfillment of its obligations to consumers of services under an agreement on the provision of services for the transmission of electric energy (hereinafter referred to as the agreement), is obliged to regulate relations for the provision of intersystem electrical connections with other grid organizations that have technological connection to electric networks owned or otherwise legally on the basis of this grid organization, in the manner prescribed by the legislation of the Russian Federation. During the transitional period of functioning of the electric power industry, the provision of services for the transmission of electric energy using facilities included in the unified national (all-Russian) electric grid is carried out on the basis of an agreement concluded both on behalf of the organization for managing the unified national (all-Russian) electric grid, and on behalf of other the owners of the said objects.

  1. RULES FOR TECHNOLOGICAL ENERGY ACCEPTING technological connection and.
  2. Decree of the Government of the Russian Federation of December 27, 2004 N 861 (ed.
  3. Government Decree. Russian Federation dated December 27, 2004 TECHNOLOGICAL CONNECTION.

II. The procedure for the conclusion and execution of the contract. The agreement is public and is obligatory for the conclusion for the network organization. Unreasonable evasion or refusal of the grid organization to conclude an agreement may be appealed by the consumer of services in the manner prescribed by the legislation of the Russian Federation. An agreement cannot be concluded before the conclusion of an agreement on the technological connection of power receivers (power installations) of legal entities and individuals to electric networks, except in cases where the consumer of services is: a person whose power receiver was technologically connected to the electric network before entry into force these Rules; a person who exports (imports) electric energy and does not own, use and dispose of electric power facilities connected to the electric grid; an energy sales organization (guaranteeing supplier) that concludes an agreement in the interests of electric energy consumers served by it. In relation to these persons, the grid organization has the right, in order to determine the technical characteristics of power receiving devices (power installations) necessary for the provision of services for the transmission of electrical energy, to request information and documentation necessary for technological connection. Under the agreement, the grid organization undertakes to implement a complex of organizational and technological related activities providing the transmission of electrical energy through the technical devices of electrical networks, and the consumer of services - to pay for them. The contract must contain the following essential conditions: the value of the maximum power of the power receiving device connected to the electrical network, with the distribution of the specified value for each point of connection of the electrical network, in respect of which technological connection was carried out in accordance with the procedure established by the legislation of the Russian Federation; the amount of power (generating or consumed), within which the grid organization assumes the obligation to ensure the transmission of electric energy at the points of connection specified in the contract; the responsibility of the consumer of services and the grid organization for the condition and maintenance of electric grid facilities, which is determined by their balance sheet ownership and is fixed in the act of delimitation of the balance sheet ownership of electric grids and the operational responsibility of the parties attached to the contract; the amount of technological and emergency armor (for consumers - legal entities or entrepreneurs without forming a legal entity that meet the relevant requirements established by the legislation of the Russian Federation in the field of electric power industry), which must be taken into account when determining the procedure for limiting the power consumption mode.

For these persons, the act of approval of emergency and technological armor is a mandatory annex to the contract; the obligations of the parties to equip points of connection with electrical energy measuring instruments, including measuring instruments that meet the requirements established by the legislation of the Russian Federation, as well as to ensure their operability and compliance with operational requirements for them during the entire term of the contract, established by the authorized body for technical regulation and metrology and manufacturer. The consumer of services assumes, in accordance with the contract, the following obligations: to pay for the grid organization services for the transmission of electric energy in the terms and amounts established by the contract; maintain in his possession or on other legal grounds relay protection and emergency automation, electricity and power meters, as well as other devices necessary to maintain the required parameters of reliability and quality of electricity, and comply with the requirements for the entire term of the contract , established for technological connection and in the rules for the operation of these facilities, instruments and devices; submit to the grid organization, within the terms established by the contract, the necessary technological information: main electrical diagrams, equipment characteristics, diagrams of relay protection devices and emergency automation, operational data on the technological modes of operation of the equipment; inform the grid organization within the terms established by the contract about emergency situations at energy facilities, planned, current and overhaul on them; inform the grid organization about the scope of participation in automatic or operational emergency control of power, in normalized primary frequency control and in secondary power control (for power plants), as well as on the list and power of current collectors of the consumer of services that can be turned off by emergency control devices; fulfill obligations to ensure the safety of operation of the energy networks under their control and the serviceability of the instruments and equipment used by them related to the transmission of electrical energy; freely allow authorized representatives of the grid organization to control and record the quantity and quality of the transmitted electric energy in the manner prescribed by the contract.

861 Decree of the Government of the Russian Federation On the Electric Power Industry

N 740 “On amendments to the Decree of the Government of the Russian Federation of December 27, 2004 N 861 for the purpose of clarification. Government Decree. Russian Federation dated December 27, 2004 TECHNOLOGICAL CONNECTION. For the operation of the relevant power receiving devices and power grid facilities; Decree of the Government of the Russian Federation of December 27, 2004 N 861 (ed. Page 1 of 129. Decree of the Government of the Russian Federation of December 27, 2004 N 861 (ed. The document was provided by the ConsultantPlus Date of preservation: 04/14/2017.

It does not work Edition from 27.12.2004

Document nameDecree of the Government of the Russian Federation of December 27, 2004 N 861 "On approval of the rules of non-discriminatory access to the services for transmitting electric energy and the provision of these services, the rules of non-discriminatory access to the service for operational dispatch management in the electric power industry and the provision of these services, the rules for non-discriminatory access to the services of the administrator of the trade WHOLESALE MARKET SYSTEMS AND PROVISION OF THESE SERVICES AND RULES FOR TECHNOLOGICAL CONNECTION OF POWER-RECEPTIONING DEVICES (POWER INSTALLATIONS) OF LEGAL ENTITIES AND INDIVIDUALS TO ELECTRIC NETWORKS"
Type of documentdecree, rules
Host bodyRussian government
Document Number861
Acceptance date04.01.2005
Revision date27.12.2004
Date of registration in the Ministry of Justice01.01.1970
StatusIt does not work
Publication
  • document in in electronic format FAPSI, STC "System"
  • "Rossiyskaya Gazeta", N 7, 01/19/2005
  • "Collection of Legislation of the Russian Federation", N 52, 12/27/2004, part 2, art. 5525
NavigatorNotes

Decree of the Government of the Russian Federation of December 27, 2004 N 861 "On approval of the rules of non-discriminatory access to the services for transmitting electric energy and the provision of these services, the rules of non-discriminatory access to the service for operational dispatch management in the electric power industry and the provision of these services, the rules for non-discriminatory access to the services of the administrator of the trade WHOLESALE MARKET SYSTEMS AND PROVISION OF THESE SERVICES AND RULES FOR TECHNOLOGICAL CONNECTION OF POWER-RECEPTIONING DEVICES (POWER INSTALLATIONS) OF LEGAL ENTITIES AND INDIVIDUALS TO ELECTRIC NETWORKS"

Decree

In order to promote the development of competition in the market for the production and sale of electrical energy, protect the rights of consumers of electrical energy and in accordance with Articles,, and the Federal Law "On the Electric Power Industry", the Government of the Russian Federation decides:

1. Approve the attached:

Rules for non-discriminatory access to electricity transmission services and provision of these services;

Rules for non-discriminatory access to services for operational dispatch control in the electric power industry and the provision of these services;

Rules for non-discriminatory access to the services of the wholesale market trading system administrator and the provision of these services;

Rules for the technological connection of power receiving devices (power plants) of legal entities and individuals to electric networks.

2. Designate the Federal Antimonopoly Service as the authorized federal executive body to ensure state control over compliance with the rules of non-discriminatory access to electric power transmission services, services for operational dispatch management in the electric power industry and the services of a trading system administrator.

3. The Ministry of Industry and Energy of the Russian Federation, within 3 months, develop and approve a methodology for determining the normative and actual losses of electrical energy in electrical networks.

Prime Minister
Russian Federation
M. FRADKOV

APPROVED
Government Decree
Russian Federation
December 27, 2004
No. 861

RULES OF NON-DISCRIMINATION ACCESS TO ELECTRICITY TRANSMISSION SERVICES AND THE PROVISION OF THESE SERVICES I. General Provisions

1. These Rules define the general principles and procedure for ensuring non-discriminatory access to electricity transmission services, as well as the provision of these services.

2. The terms used in these Rules mean the following:

"territorial distribution network" - a complex of power transmission lines and equipment that are not part of the unified national (all-Russian) electrical network, used to provide services for the transmission of electrical energy;

"grid organizations" - commercial organizations whose main activity is the provision of services for the transmission of electric energy through electric networks, as well as the implementation of measures for technological connection;

"point of connection to the electrical network" - the place of physical connection of the power receiver (power plant) (hereinafter referred to as the power receiver) of the consumer of services for the transmission of electrical energy (hereinafter referred to as the consumer of services) with the electrical network of the grid organization;

"transmission capacity of the electrical network" - technologically maximum permissible value power that can be transferred taking into account the operating conditions and reliability parameters of the operation of electric power systems;

"balance sheet ownership boundary" - a line for dividing power grid facilities between owners on the basis of ownership or possession on a different legal basis.

Other concepts used in these Rules correspond to the concepts defined by the legislation of the Russian Federation.

3. Non-discriminatory access to electricity transmission services provides for equal conditions for the provision of these services to their consumers, regardless of the legal form and legal relationship with the person providing these services.

4. Grid organizations are obliged to disclose information regarding access to electricity transmission services and the provision of these services in accordance with the standards for information disclosure by wholesale and retail electricity market entities.

5. These Rules do not apply to relations related to the provision of intersystem electrical connections, unless otherwise provided by the legislation of the Russian Federation.

6. Services for the transmission of electrical energy are provided by the grid organization on the basis of an agreement on the provision of paid services for the transmission of electrical energy to persons who have, on the right of ownership or on another legal basis, power receiving devices and other objects of the electric power industry, technologically connected in the prescribed manner to the electrical network, as well as entities of the wholesale electricity market that export (import) electricity, energy sales organizations and guaranteeing suppliers.

7. The grid organization, in fulfillment of its obligations to consumers of services under an agreement on the provision of services for the transmission of electrical energy (hereinafter referred to as the agreement), is obliged to regulate relations for the provision of intersystem electrical connections with other grid organizations that have technological connection to electric networks owned or other legal grounds with this grid organization, in the manner prescribed by the legislation of the Russian Federation.

8. During the transitional period of operation of the electric power industry, the provision of services for the transmission of electric energy using facilities included in the unified national (all-Russian) electric grid is carried out on the basis of an agreement concluded both on behalf of the organization for managing the unified national (all-Russian) electric grid, and on behalf of on behalf of other owners of the said objects.

II. The procedure for concluding and executing the contract

9. The agreement is public and is obligatory for the conclusion for the network organization.

Unreasonable evasion or refusal of the grid organization to conclude an agreement may be appealed by the consumer of services in the manner prescribed by the legislation of the Russian Federation.

10. An agreement cannot be concluded before the conclusion of an agreement on the implementation of technological connection of power receiving devices (power plants) of legal entities and individuals to electric networks, except for cases when the consumer of services is:

a person whose power receiving device was technologically connected to the electrical network before the entry into force of these Rules;

a person who exports (imports) electric energy and does not own, use and dispose of electric power facilities connected to the electric grid;

an energy sales organization (guaranteeing supplier) that concludes an agreement in the interests of electric energy consumers served by it.

In relation to these persons, the grid organization has the right, in order to determine the technical characteristics of power receiving devices (power installations) necessary for the provision of services for the transmission of electrical energy, to request information and documentation necessary for technological connection.

11. Within the framework of the agreement, the grid organization undertakes to carry out a set of organizational and technologically related actions that ensure the transmission of electric energy through the technical devices of electric networks, and the consumer of services - to pay for them.

12. The contract must contain the following essential conditions:

the value of the maximum power of the power receiving device connected to the electrical network, with the distribution of the specified value for each point of connection of the electrical network, in respect of which technological connection was carried out in accordance with the procedure established by the legislation of the Russian Federation;

the amount of power (generating or consumed), within which the grid organization assumes the obligation to ensure the transmission of electric energy at the points of connection specified in the contract;

the responsibility of the consumer of services and the grid organization for the condition and maintenance of electric grid facilities, which is determined by their balance sheet ownership and is fixed in the act of delimitation of the balance sheet ownership of electric grids and the operational responsibility of the parties attached to the contract;

the value of technological and emergency armor (for consumers - legal entities or entrepreneurs without forming a legal entity that meet the relevant requirements established by the legislation of the Russian Federation in the field of electric power industry), which must be taken into account when determining the procedure for limiting the power consumption mode. For these persons, the act of approval of emergency and technological armor is a mandatory annex to the contract;

the obligations of the parties to equip points of connection with electrical energy measuring instruments, including measuring instruments that meet the requirements established by the legislation of the Russian Federation, as well as to ensure their operability and compliance with operational requirements for them during the entire term of the contract, established by the authorized body for technical regulation and metrology and manufacturer.

13. The consumer of services assumes the following obligations in accordance with the contract:

pay the grid organization services for the transmission of electrical energy in the terms and amounts established by the contract;

maintain in his possession or on another legal basis relay protection and emergency automation, electricity and power meters, as well as other devices necessary to maintain the required parameters of reliability and quality of electricity, and comply with the requirements for the entire term of the contract , established for technological connection and in the rules for the operation of these facilities, instruments and devices;

submit to the grid organization, within the terms established by the contract, the necessary technological information: main electrical diagrams, equipment characteristics, diagrams of relay protection devices and emergency automation, operational data on the technological modes of operation of the equipment;

inform the grid organization within the terms established by the contract about emergency situations at energy facilities, scheduled, current and major repairs at them;

inform the grid organization about the scope of participation in automatic or operational emergency control of power, in normalized primary frequency control and in secondary power control (for power plants), as well as on the list and power of current collectors of the consumer of services that can be turned off by emergency control devices;

fulfill obligations to ensure the safety of operation of the energy networks under their control and the serviceability of the instruments and equipment used by them related to the transmission of electrical energy;

freely allow authorized representatives of the grid organization to control and record the quantity and quality of the transmitted electric energy in the manner prescribed by the contract.

14. The grid organization assumes the following obligations in accordance with the contract:

ensure the transmission of electrical energy to the power receiving devices of the consumer of services, the quality and parameters of which must comply with technical regulations and other mandatory requirements;

to carry out the transmission of electrical energy in accordance with the agreed reliability parameters, taking into account the technological characteristics of power receiving devices (power plants);

in the manner and terms established by the contract, inform the consumer of services about emergency situations in electrical networks, repair and maintenance work that affect the fulfillment of obligations under the contract;

freely allow authorized representatives of consumers of services to control and record the quantity and quality of the transmitted electric energy in the manner prescribed by the contract.

15. A person who intends to conclude an agreement (hereinafter referred to as the applicant) sends an application in writing to the grid organization for the conclusion of an agreement, which must contain the following information:

details of the consumer of services for the transmission of electrical energy; volumes and expected mode of transmission of electrical energy, broken down by months;

the volume of maximum power and the nature of the load of power receiving devices (power plants) connected to the network (generating or consumed), with its distribution over each point of connection of the electrical network and indicating the boundaries of the balance sheet;

single-line diagram of the electrical network of the consumer of services connected to the networks of the grid organization;

points of connection to the networks of a grid organization indicating for each of the points of connection to the network the values ​​of the declared power, including the values ​​of power during the period of maximum loads of consumers of electric energy;

the date of commencement of the provision of services for the transmission of electrical energy;

reference to an agreement on the provision of services for operational dispatch control (in the case of an agreement on the provision of services for the transmission of electric energy with an organization for the management of a unified national (all-Russian) electric grid).

16. The grid organization, within 30 days from the date of receipt of the application for concluding an agreement, is obliged to consider it and send to the applicant a draft agreement signed by the grid organization or a reasoned refusal to conclude it.

17. If the information specified in paragraph 15 of these Rules is missing, the grid organization notifies the applicant about this within 6 working days and, within 30 days from the date of receipt of the missing information, considers the application in accordance with paragraph 16 of these Rules.

18. An applicant who has received a draft agreement from a grid organization shall fill it out in the part relating to the information about the applicant included in the agreement and send one copy of the agreement to the grid organization signed by him.

19. The contract is considered concluded from the date of its signing by the applicant, unless otherwise provided by the contract or a court decision.

20. The grid organization has the right to refuse to conclude an agreement in the event of:

the consumer of services does not have a concluded agreement on the provision of services for operational dispatch control (in the case of the conclusion of an agreement on the provision of services for the transmission of electric energy with an organization for the management of a unified national (all-Russian) electric grid);

lack of technical feasibility to provide services for the transmission of electrical energy in the declared volume (if the declared amount of power, the proper transmission of which cannot be ensured by the grid organization based on the existing conditions of technological connection);

sending an application for the conclusion of an agreement by a person who does not have a technological connection to the electric networks of this grid organization. At the same time, a prerequisite for concluding an agreement with last resort suppliers and energy sales organizations is the presence of a technological connection of consumers of electric energy, in whose favor the agreement is concluded, and for organizations engaged in the export-import of electric energy, the presence of a connection of the electric networks of this grid organization with electric networks neighboring states, through whose territories export-import deliveries of electric energy are carried out.

21. If it is not technically possible to provide services for the transmission of electric energy within the volume declared by the consumer of services, the grid organization is obliged to notify the applicant within 30 days of the conditions and to what extent the service can be provided and the contract is concluded.

22. If there are grounds for refusal to conclude an agreement, the grid organization is obliged, no later than 30 days from the date of receipt of the application specified in paragraph 15 of these Rules, to send to the applicant in writing a reasoned refusal to conclude an agreement with supporting documents attached.

Refusal to conclude an agreement may be challenged in the manner prescribed by the legislation of the Russian Federation.

23. A prerequisite for the provision of services for the transmission of electrical energy to the consumer of services, it is the presence of the status of a wholesale market participant or a contract for the sale of electrical energy concluded with a guaranteeing supplier, energy sales organization or other supplier of electrical energy.

24. The grid organization has the right to suspend the transmission of electric energy in the following cases:

occurrence of debt of the consumer of services for payment for services for the transmission of electric energy for 2 or more billing periods;

violation by the consumer of services of the terms of payment for services for the transmission of electrical energy, defined in the contract of sale and purchase concluded by him (contract on connection to the wholesale market of electrical energy (capacity), - if there is a corresponding notice in writing from the administrator of the trading system, the guaranteeing supplier or the energy sales organization with the attachment of supporting documents indicating the amount of the consumer's debt confirmed by the reconciliation act or a court decision, the deadline for its repayment, as well as the expected period for introducing restrictions on the consumption regime;

connection by the consumer of services to the electrical network of power receivers (power plants) that do not comply with the terms of the contract, or connection carried out in violation of the procedure for technological connection of power receivers of legal entities and individuals to electrical networks.

25. The transmission of electrical energy is suspended in the event of:

the absence or expiration of the period for fulfilling the obligations of the supplier (seller) of electric energy to the consumer under the contract for the supply (purchase and sale, power supply, etc.) of electric energy (capacity), which must be transmitted through the networks of the grid organization;

termination of participation of the consumer of services in the wholesale market, of which the grid organization must be notified in writing by the supplier of electric energy or the administrator of the trading system, indicating the grounds, at least 10 days before the date of termination of these obligations. Such notification is simultaneously sent to the consumer.

26. Suspension of the transmission of electrical energy does not entail termination of the contract.

When the transmission of electrical energy is suspended on the grounds provided for in paragraph 24 of these Rules, consumers of services may partially or completely limit the mode of consumption of electrical energy in the prescribed manner.

The consumer of services cannot be limited in the consumption of electrical energy less than the amount of power established in the act of harmonization of emergency and technological armor, with the exception of cases established by the legislation of the Russian Federation.

27. The provision of services for the transmission of electric energy may be suspended by the grid organization, subject to prior notification of this to the consumer of services no later than 10 working days before the date of the proposed suspension of the transmission of electric energy.

The transmission of electric energy is suspended by the grid organization no later than 2 days from the date of the proposed introduction of the restriction specified in the notice of the administrator of the trading system (supplier of electric energy), also sent to the consumer of electric energy.

If the circumstances that were the basis for the suspension of the transmission of electric energy are eliminated before the expiration of the specified period, the suspension of the transmission of electric energy is not performed.

The transmission of electrical energy is resumed no later than 48 hours from the receipt of documentary confirmation of the elimination of the circumstance that was the basis for the suspension of the transmission of electrical energy.

28. Termination of the contract, including after its expiration, does not entail the disconnection of the power receiving device of the consumer of services from the electrical network.

29. An interruption in the transmission of electrical energy, termination or restriction of the transmission of electrical energy is allowed by agreement of the parties, except in cases where the unsatisfactory condition of the power receiving device (power plant) of the consumer of services, certified by the authorized federal executive body for technological supervision, threatens an accident or creates a threat to life and security. The grid organization is obliged to notify the consumer of services about the interruption, termination or restriction of the transmission of electric energy due to the indicated circumstances within 3 days from the date of such a decision, but no later than 24 hours before the introduction of these measures.

III. The order of access to electric networks in conditions of their limited capacity

30. When connecting to the electrical network and concluding an agreement, any consumer of services is assigned the right to receive electric energy at any time during the validity of the agreement within the limits of the connected capacity determined by the agreement, the quality and parameters of which must comply with technical regulations and other mandatory requirements.

When accessing electricity transmission services in conditions of limited bandwidth electrical networks, the possibility of charging an additional fee is excluded.

31. Restriction of the right to receive electrical energy is possible only in the event of a deviation from the normal modes of operation of the electrical network, caused by emergency situations and (or) withdrawal of electric power facilities for repair or out of operation and leading to a shortage of power.

At the same time, the limitation of the consumption of electrical energy is carried out in accordance with the acts of harmonization of emergency and technological armor.

32. The transmission capacity of the electric grid is determined according to the design scheme of the Unified Energy System of Russia, developed by the system operator together with the organization for managing the unified national (all-Russian) electric grid, taking into account the predicted balances of electric energy and capacity. When making such calculations, repair schedules for the main generating equipment (agreed with generating companies), equipment for electrical substations and power lines, power receiving equipment for consumers of electrical energy with a controlled load are also taken into account.

The system operator and the organization for managing the unified national (all-Russian) electric grid communicate to market participants information about the restrictions on the transmission capacity of the electric network, including the results of these calculations.

IV. The procedure for setting tariffs for services for the transmission of electrical energy, which provides for taking into account the degree of use of the power of the electrical network

33. Tariffs for electric power transmission services are established taking into account the use by consumers of the indicated services of the capacity of the electric network to which they are directly technologically connected.

34. The consumer of services must notify the grid organization at least 6 months before the next tariff regulation period of the amount of declared capacity for the coming calendar year, which reflects the degree of use of the electric network capacity by the consumer of services.

The value of the declared capacity is determined in relation to each connection point and cannot exceed the maximum connected capacity at the corresponding point of connection to the network of this consumer of services.

In the absence of the specified notification on the amount of the declared capacity, when setting tariffs, the value of the maximum connected capacity of the power receiving device (power plant) of the consumer of services is taken.

When determining the base for setting tariffs for the next regulation period, the grid organization has the right to use, in relation to consumers of services that systematically exceed the amount of declared capacity, the amount of capacity declared by the consumer for the next regulation period or the actual amount of used capacity over the past period.

35. Tariffs for electric power transmission services are established in accordance with the pricing principles for electric and thermal energy in the Russian Federation and the rules of state regulation and application of tariffs for electric and thermal energy in the Russian Federation, taking into account paragraph 34 of these Rules.

Accounting for the degree of use of the capacity of the electrical network when determining the tariff for services for the transmission of electrical energy is carried out in accordance with the methodological guidelines approved by the federal executive authority for tariffs.

V. The procedure for determining losses in electrical networks and paying for these losses

36. Actual losses of electrical energy in electrical networks are defined as the difference between the volume of electrical energy supplied to the electrical network from other networks or from electrical energy producers and the volume of electrical energy consumed by power receiving devices connected to this network, as well as transferred to other network organizations.

37. Grid organizations are obliged to compensate for the actual losses of electric energy that have arisen in the objects of the network economy belonging to them, minus the losses included in the price of electric energy.

38. Consumers of services, with the exception of electricity producers, are obliged to pay, as part of the payment for services for the transmission of electrical energy, the standard losses arising from the transmission of electrical energy through the network of a grid organization with which the relevant persons have concluded an agreement, with the exception of losses included in the price (tariff) for electricity, in order to avoid their double counting. Consumers of services pay for losses of electric energy in excess of the norm if it is proved that the losses arose due to the fault of these consumers of services.

39. The amount of losses of electrical energy in electrical networks, which is part of the payment for services for the transmission of electrical energy, is determined on the basis of the standard for losses of electrical energy. Loss standards are established by the authorized federal executive body in accordance with these Rules and the methodology for determining the normative and actual losses of electrical energy in electrical networks.

40. Standards for losses of electrical energy in electrical networks are established in relation to the totality of power transmission lines and other objects of the electrical network economy owned by the relevant grid organization, taking into account the differentiation by voltage levels of the networks when setting tariffs for services for the transmission of electrical energy.

41. The methodology for determining the normative and actual losses of electrical energy in electrical networks should provide for the calculation of losses based on:

technical characteristics of power transmission lines and other electric grid facilities that determine the amount of variable losses in accordance with the technology of transmission and conversion of electrical energy;

normative conditionally constant losses for power lines, power transformers and other electric grid facilities;

normative losses in the means of measuring electrical energy.

When setting standards, the technical condition of power lines and other electric grid facilities may also be taken into account.

42. Grid organizations purchase electricity in order to compensate for the loss of electricity in their networks:

on the wholesale electricity market;

if the grid organization is not a participant in the wholesale electricity market - in the retail electricity market at the place of its activity.

VI. The procedure for the provision and disclosure by grid organizations of information on the capacity of electric networks, on their technical characteristics and on the cost of services for the transmission of electric energy

43. Information on the transmission capacity of electric networks and on their technical characteristics shall be disclosed by the grid organization in accordance with the standards for disclosure of information by subjects of the wholesale and retail electric energy markets.

44. The grid organization discloses information on the technical characteristics of electric networks on a quarterly basis no later than 30 business days from the date of the end of the quarter.

45. Information on the availability of transmission capacity of electrical networks and on the cost of services for the transmission of electrical energy, the grid organization is obliged to provide upon request (in writing) of the consumer of services.

46. ​​The requested information shall be provided within 7 days from the date of receipt of the request with reimbursement by the consumer of services for the costs of its provision, actually incurred by the grid organization.

47. Documents containing the requested information must be drawn up in the prescribed manner by network organizations.

48. The grid organization is responsible for the timeliness, completeness and reliability of the information provided and disclosed in the manner prescribed by the legislation of the Russian Federation.

VII. The procedure for considering applications (complaints) on issues of providing access to services for the transmission of electric energy and making decisions on these applications (complaints) that are binding on legal entities and individuals

49. The grounds for initiating and considering cases on issues of providing access to electricity transmission services, making decisions and issuing orders by the antimonopoly authority are statements by state authorities or statements (complaints) of legal entities and individuals.

50. The application (complaint) must contain information about the applicant and the person in respect of whom the application (complaint) is filed, a description of the violation of the requirements of these Rules, as well as the requirements with which the applicant applies.

51. The antimonopoly body considers the application (complaint) within one month from the date of its receipt.

If there is insufficient or no evidence to conclude that there are or are no signs of violation of the requirements of these Rules, the antimonopoly body has the right to extend the period for consideration of the application (complaint) up to 3 months from the date of its receipt in order to collect and analyze additional evidence. The antimonopoly body shall be obliged to notify the applicant in writing of the extension of the term for consideration of an application (complaint).

52. If there are no signs of violation of the requirements of these Rules and the antimonopoly legislation, the antimonopoly body shall notify the applicant in writing within 10 days from the date of the decision.

53. Cases of violations of the antimonopoly legislation are considered by the antimonopoly body in accordance with the legislation of the Russian Federation.

54. Consideration of cases of violations of the requirements of these Rules in terms of providing access to services for the transmission of electric energy and antimonopoly legislation and the adoption of decisions (orders) on them are carried out in the manner established by the federal antimonopoly body.

55. Federal executive authorities, executive authorities of the constituent entities of the Russian Federation, local governments, other bodies or organizations (their officials) endowed with the functions or rights of these authorities, commercial and non-profit organizations(their heads), individuals, including individual entrepreneurs, have the right to appeal against decisions and orders in whole or in part of the antimonopoly body in the manner prescribed by the legislation of the Russian Federation.

APPROVED
Government Decree
Russian Federation
December 27, 2004
No. 861

RULES FOR NON-DISCRIMINATION ACCESS TO OPERATIONAL AND DISPATCH MANAGEMENT SERVICES IN THE ELECTRIC POWER INDUSTRY AND PROVISION OF THESE SERVICES

1. These Rules define the general principles and procedure for ensuring non-discriminatory access of subjects of the electric power industry (hereinafter referred to as consumers of services) to services for operational dispatch control in the electric power industry (hereinafter referred to as services) provided by the system operator and other subjects of operational dispatch control (hereinafter referred to as the system operator ), as well as the procedure for the provision of these services.

2. These Rules do not apply to relations related to the provision of services by subordinate entities of operational dispatch control in the electric power industry to higher entities of operational dispatch control in the electric power industry.

3. Non-discriminatory access to services provides for equal conditions for the provision of services to their consumers, regardless of their organizational and legal form and legal relations with the person providing these services.

4. The system operator is obliged to disclose information regarding access to services and the provision of services in accordance with the standards for information disclosure by subjects of the wholesale and retail electricity markets.

5. The system operator provides the following services:

a) management of technological modes of operation of electric power facilities;

b) medium-term and long-term forecasting of the volume of production and consumption of electrical energy;

c) participation in the formation of a reserve of production energy capacities;

d) coordinating the decommissioning and decommissioning of electric grid facilities and power facilities for the production of electrical and thermal energy, as well as putting them into operation after repair;

e) development of daily schedules for the operation of power plants and electrical networks of the Unified Energy System of Russia;

f) regulation of the frequency of electric current, ensuring the functioning of the system for automatic regulation of the frequency of electric current and power, ensuring the functioning of system and emergency automation;

g) organization and management of parallel operation modes of the Unified Energy System of Russia and electric power systems of foreign states;

h) participation in the formation and issuance of technological requirements for the technological connection of electric power industry entities to the unified national (all-Russian) electric grid and territorial distribution networks that ensure their operation as part of the Unified Energy System of Russia.

6. Services are provided on the basis of a bilateral agreement on the provision of services for operational dispatch control in the electric power industry (hereinafter referred to as the agreement), as well as on the basis of an agreement on accession to trading system wholesale electricity market.

7. The consumer of services may simultaneously be a party to the agreements specified in paragraph 6 of these Rules only under the following conditions:

the provisions of these contracts relating to the provision of services are fully the same;

the total cost of services rendered on the basis of these contracts is determined by the tariffs established by the federal executive authority for tariffs.

8. The conclusion of an agreement between the consumer of services and the system operator is mandatory for both parties.

9. Wholesale market entities enter into an agreement with the system operator before they conclude an agreement with the organization managing the unified national (all-Russian) electric grid on the provision of services for the transmission of electric energy through the unified national (all-Russian) electric grid.

10. The price of services is determined by the tariffs established by the federal executive authority on tariffs.

11. The consumer of services who intends to conclude an agreement (hereinafter referred to as the applicant) sends to the system operator an application in writing for providing access to services, which must contain the following information:

details of the consumer of services;

points of connection to networks of the network organization;

service start dates.

The applicant simultaneously with the application has the right to send the draft contract to the system operator.

12. The system operator, within 30 days from the date of receipt of an application for providing access to services, is obliged to consider it and make a decision on granting access to services or refusing it.

13. In the absence of the information specified in paragraph 11 of these Rules, the system operator notifies the applicant about this within 3 days and, within 30 days from the date of receipt of the missing information, considers the application for providing access to services in accordance with paragraph 12 of these Rules.

14. If a decision is made to provide access to services, the system operator is obliged to send the applicant a draft agreement signed on its part.

15. An applicant who has received a signed draft agreement from the system operator and has no objections to its terms, fills out the agreement in the part related to information about the applicant, and sends 1 signed copy of the agreement to the system operator.

16. If the applicant submitted a draft agreement, and the system operator has no objections to its terms, the latter is obliged to sign it and send 1 signed copy of the agreement to the applicant.

The contract is considered concluded from the date of its signing by both parties, unless otherwise provided by this contract or a court decision.

17. If a decision is made to refuse to provide access to services, the system operator is obliged to send the applicant a written notice and supporting documents no later than 10 days from the date of receipt of the application specified in paragraph 11 of these Rules.

Refusal to provide access to services may be appealed to the antimonopoly body and (or) challenged in court.

18. The system operator has the right to refuse to provide access to services in the following cases:

a) the applicant did not provide the information provided for in paragraph 11 of these Rules;

b) the applicant provided false information;

c) the applicant's energy facilities are located outside the zone of his dispatching responsibility.

In this case, the applicant has the right to re-apply to the system operator with an application for providing access to services. When the grounds for refusal are eliminated, the system operator is not entitled to refuse the applicant to provide access to services.

19. The provision of services is carried out in order to ensure reliable energy supply and quality of electric energy that meet the requirements of technical regulations and other mandatory requirements established by regulatory legal acts, and to take measures to ensure the fulfillment of obligations of electric power industry entities under contracts concluded on the wholesale and retail electric energy markets.

As part of the provision of services, the system operator is obliged to choose the most cost-effective solution that ensures the safe and trouble-free operation of the technological infrastructure of the electric power industry and the quality of electric energy that meets the requirements of technical regulations and other mandatory requirements.

20. Consumers of services have the right not to execute operational dispatching commands and orders if their execution poses a threat to human life, safety of equipment or leads to violation of the limits and conditions for the safe operation of nuclear power plants.

21. In the event of emergency electric power modes, the provision of services is carried out taking into account the specifics established by the legislation of the Russian Federation.

APPROVED
Government Decree
Russian Federation
December 27, 2004
No. 861

RULES OF NON-DISCRIMINATION ACCESS TO THE SERVICES OF THE ADMINISTRATOR OF THE WHOLESALE MARKET TRADING SYSTEM AND PROVISION OF THESE SERVICES

1. These Rules determine the general principles and procedure for ensuring non-discriminatory access of subjects of the wholesale electricity (capacity) market (hereinafter referred to as wholesale market entities) to services for organizing the functioning of the trading system of the wholesale electricity (capacity) market, organizing wholesale trade electrical energy and reconciliation and offset of mutual counter obligations of trade participants (hereinafter - services) of the wholesale market trading system administrator (hereinafter - administrator), as well as the procedure for providing these services.

2. Non-discriminatory access to the administrator's services provides for the provision of equal conditions for the provision of services to subjects of the wholesale market, regardless of their organizational and legal form and legal relations with the person providing these services.

3. The administrator is obliged to disclose information regarding access to services and their provision, in accordance with the standards for information disclosure by subjects of the wholesale and retail electricity markets.

4. The administrator is not entitled to refuse to provide services to wholesale market entities, except for the cases established by these Rules and the rules of the wholesale electricity market.

5. Administrator services can be provided to persons:

listed commercial organizations- entities of the federal (all-Russian) wholesale electricity (capacity) market, for which electricity tariffs are set by the federal executive authority on tariffs, until the rules of the wholesale electricity market come into force;

who have received the status of a wholesale market entity in accordance with the rules of the wholesale electricity market by providing the administrator with the documents and information specified in these Rules, and signing by the wholesale market entities of an agreement on joining the trading system of the wholesale electricity (capacity) market.

6. A legal entity wishing to gain access to the administrator's services (hereinafter referred to as the applicant) is obliged to submit an application for this and submit the following documents to the administrator:

information on the type of wholesale market entity (generating company, energy sales organization, energy supply organization, guaranteeing supplier, consumer of electric energy, etc.), to which the applicant corresponds, in accordance with the rules of the wholesale electricity (capacity) market of the transitional period;

signed by an authorized person of the applicant 5 copies of the draft agreement on joining the trading system of the wholesale electricity (capacity) market in the form approved by the administrator;

the applicant's questionnaire in the prescribed form;

notarized copies of constituent documents;

notarized copy of the certificate of state registration legal entity;

a notarized copy of the applicant's registration certificate tax authorities Russian Federation;

documents confirming the authority of persons representing the interests of the applicant;

a document confirming that the organization has been granted the status of a supplier of last resort in the cases and in the manner established by the legislation of the Russian Federation;

a single-line diagram of connection to an external electrical network, agreed with the owner or other legal owner of the network facilities to which the applicant or third parties whose interests he represents are technologically connected, indicating the names and voltage levels of the buses of external substations, the proposed groups of supply points, places for connecting devices commercial accounting, measuring voltage transformers and the boundaries of the balance sheet, certified by representatives of adjacent owners of electrical networks;

acts of delimitation of balance sheet ownership and operational responsibility, agreed with the owners or other legal owners of grid facilities to which the applicant is technologically connected or third parties whose interests the applicant intends to represent.

The applicant, who has the right to purchase and sell electricity (capacity) in the regulated sector, is obliged to submit to the administrator a document confirming the inclusion of the legal entity in the list of commercial organizations - subjects of the federal (all-Russian) wholesale electricity (capacity) market, for which electricity tariffs are established by the federal executive authority on tariffs.

In order to confirm the compliance of the generating and power receiving equipment with the quantitative characteristics presented to the objects participating in the wholesale electricity market, the applicant submits to the administrator the passport technological characteristics of the specified equipment.

7. The applicant representing the interests of third parties in the wholesale electricity (capacity) market shall submit to the administrator information on the technological characteristics of the generating equipment of the suppliers whose interests he represents, and (or) the technological characteristics of the energy receiving equipment of the consumers whose interests he represents.

The applicant, carrying out activities for the transmission of electrical energy and buying electrical energy on the wholesale market of electrical energy (capacity), in order to compensate for losses in electrical networks, submits to the administrator the characteristics of the electrical network and network facilities for each group of supply points (grid facility).

In order to obtain data on the actual production and consumption of energy, as well as to carry out settlements on the wholesale electricity (capacity) market, the applicant shall submit documents confirming the compliance of the commercial metering system with the mandatory technical requirements and conditions of the agreement on joining the trading system of the wholesale electricity (capacity) market ), in the order determined by the administrator.

All documents must be submitted by the applicant in accordance with the requirements determined by the administrator.

The administrator is not entitled to require the submission of information not provided for by these Rules, unless otherwise provided by the legislation of the Russian Federation.

In order to ensure equal access to the services of the administrator, the owner or other legal owner of the network facilities to which the applicant is technologically connected or third parties whose interests he represents, is obliged to ensure the coordination of the single-line connection scheme to the external electrical network and draw up acts of delimitation of the balance sheet of responsibility.

8. The administrator has the right to refuse access to the services of the administrator, if the applicant:

a) did not submit the documents and information provided for in paragraph 6 of these Rules;

b) provided false information;

c) does not comply with any of the requirements established by the legislation of the Russian Federation for wholesale market entities.

The applicant has the right to re-apply to the administrator with an application for granting access to the administrator's services when the grounds for denying the applicant access to the administrator's services are eliminated.

9. The decision to refuse access to the administrator's services may be appealed in the manner prescribed by the legislation of the Russian Federation.

10. The administrator provides services to wholesale market entities on the basis of an agreement on joining the trading system of the wholesale electricity market.

A signed copy of the agreement on joining the trading system of the wholesale electricity (capacity) market is sent by the administrator to the wholesale market entity.

11. Administrator's services are paid by the wholesale market entity at the tariffs approved by the federal executive authority on tariffs.

12. If the wholesale market entity fails to pay for the services of the administrator, the administrator has the right to suspend the acceptance of applications from the wholesale market entity for participation in the competitive selection of price bids in the free trade sector of the wholesale market until the debt is fully repaid.

13. The administrator has the right to terminate the provision of services to the wholesale market entity in the event of:

non-compliance of the legal entity with the requirements for the wholesale market entity;

loss legal entity the status of a wholesale market entity;

repeated non-fulfillment or improper fulfillment by the wholesale market entity of obligations to pay for the services of the administrator;

termination of the agreement on accession to the trading system of the wholesale market;

termination of the activities of the wholesale market entity on the grounds provided for by the legislation of the Russian Federation.

1. These Rules determine the procedure for technological connection of power receiving devices (power installations) of legal entities and individuals (hereinafter referred to as power receiving devices), regulate the procedure for technological connection, determine the essential terms of the agreement on technological connection to electric networks (hereinafter referred to as the contract), establish requirements for issuance of individual technical conditions for connection to electric networks (hereinafter referred to as technical conditions) and criteria for the presence (absence) of the technical possibility of technological connection.

2. These Rules apply to persons whose power receiving devices were previously connected to the electrical network and who declared the need to revise (increase) the amount of connected power.

3. The grid organization is obliged to carry out, in relation to any person who applies to it, measures for technological connection of newly commissioned, newly built, expanding their previously connected capacity and reconstructed power receiving devices to their electric networks (hereinafter referred to as technological connection), subject to their compliance with these Rules and availability of technical feasibility of technological connection.

In relation to power receiving devices technologically connected to the electrical network before the entry into force of these Rules, the contract is not concluded and the measures specified in paragraph 12 of these Rules are not performed.

4. Any persons have the right to technological connection of power transmission lines built by them to electric networks in accordance with these Rules.

5. When connecting power plants to the power plant switchgears, the latter performs the functions of a grid organization in terms of carrying out activities under the contract.

6. Technological connection is carried out on the basis of an agreement concluded with a grid organization within the time limits established by these Rules. The conclusion of the contract is obligatory for the network organization. In the event of an unjustified refusal or evasion of a grid organization from concluding a contract, the interested person has the right to apply to the court with a claim for compulsion to conclude a contract and recovery of losses caused by such unjustified refusal or evasion.

7. These Rules establish the following procedure for technological connection:

filing an application for technological connection with the requirement to issue technical conditions;

preparation of technical specifications and submission of a draft agreement, including technical specifications;

conclusion of an agreement;

fulfillment of technical conditions by the affiliated person and by the grid organization;

performing actions to connect and ensure the operation of the power receiving device in the electrical network;

verification of compliance with technical conditions and drawing up an act on technological connection.

II. The procedure for concluding and fulfilling the contract

8. In order to obtain technical conditions and carry out technological connection, the person who owns the power receiving device sends an application for technological connection (hereinafter referred to as the application) to the grid organization, to the electrical network of which technological connection is planned.

9. The application must contain the following information:

a) full name of the applicant;

b) the location of the applicant;

c) the postal address of the applicant;

d) location plan of the power receiving device, in respect of which it is planned to carry out measures for technological connection;

e) the maximum power of the power receiving device and its technical characteristics, the number, power of generators and transformers connected to the network;

f) the number of points of connection to the electrical network, indicating the technical parameters of the elements of electrical installations connected at specific points of the electrical network;

g) a single-line diagram of the applicant's electrical networks connected to the networks of the grid organization, indicating the possibility of redundancy from its own power supply sources (including redundancy of own needs) and the possibility of switching loads (generation) through the applicant's internal networks;

h) the declared level of reliability of the power receiving device;

i) the nature of the load of the consumer of electrical energy (for generators - the possible speed of increasing or decreasing the load) and the presence of loads that distort the shape of the electric current curve and cause voltage asymmetry at the connection points;

j) the value and justification of the value of the technological minimum (for generators) and emergency armor (for consumers of electrical energy);

k) permission of the authorized body of state supervision for admission to operation of the power receiving device (with the exception of facilities under construction);

l) the scope of possible participation in automatic or operational emergency control of power (for power plants and consumers, with the exception of individuals) in the procedure for the provision of services in accordance with a separate agreement;

m) the scope of possible participation in the normalized primary frequency regulation and in the secondary power regulation (for power plants) in the procedure for the provision of services in accordance with a separate agreement;

n) the list and power of the current collectors of the consumer (with the exception of individuals), which can be turned off using an emergency automatic device.

The list of information specified in the application is exhaustive.

The grid organization is not entitled to require the submission of information not provided for by these Rules.

10. The grid organization is obliged to send the draft contract to the applicant for approval within 30 days from the date of receipt of the application.

In the absence of the information specified in clause 9 of these Rules, or if they are incomplete, the grid organization notifies the applicant about this within 6 working days and considers the application within 30 days from the date of receipt of the missing information.

When especially complex nature technological connection of power receiving devices for the organization managing the unified national (all-Russian) electric grid or other owners of objects of such a network, the specified period, by agreement of the parties, may be extended to 90 days. The applicant is notified of the extension of the term and the grounds for its change.

11. The contract must contain the following essential conditions: measures for technological connection and obligations of the parties for their implementation;

fulfillment of technical conditions;

deadlines for the implementation by the network organization of measures for technological connection;

the amount of payment for the implementation of measures for technological connection;

the responsibility of the parties for the fulfillment of the terms of the contract;

boundaries of delimitation of balance sheet ownership.

12. Measures for technological connection include:

a) development of a power supply scheme;

b) technical inspection (survey) of connected power receiving devices by an authorized state authority with the participation of representatives of the grid organization;

c) preparation and issuance of technical specifications;

d) fulfillment of technical conditions (on the part of the person whose power receiving device is connected, and on the part of the grid organization);

e) actual actions to connect and ensure the operation of the power receiving device in the electrical network;

f) verification of compliance with technical conditions and drawing up an act on technological connection.

The list of measures for technological connection is exhaustive.

It is prohibited to impose on a person interested in technological connection services that are not provided for by these Rules.

13. The grid organization is obliged, within 30 days from the date of receipt of the application, to consider it, prepare technical conditions for technological connection and coordinate them with the system operator (subject of operational dispatch control), and the organization managing the unified national (all-Russian) electric grid or other owners objects of such a network in the cases provided for in paragraph three of clause 10 of these Rules - within 90 days.

The grid organization is obliged, within 5 days from the date of receipt of the application, to send a copy of it for consideration by the system operator (subject of operational dispatch control), and then, together with him, consider it and prepare technical conditions for technological connection.

14. Technical conditions for technological connection are an integral part of the contract.

The specifications must include:

a) schemes for the issuance or reception of power and points of connection to the electrical network (power lines or base substations);

b) justified requirements for strengthening the existing electrical network in connection with the connection of new capacities (construction of new power lines, substations, increase in the cross-section of wires and cables, increase in the power of transformers, expansion of switchgears, installation of compensating devices to ensure the quality of electricity);

c) design values ​​of short-circuit currents, requirements for relay protection, voltage regulation, emergency automation, telemechanics, communications, isolation and overvoltage protection, as well as for electrical energy and power meters in accordance with the requirements established by regulatory legal acts;

d) requirements for equipping power plants with emergency control devices for issuing its power and for equipping consumers with emergency control devices;

e) requirements for equipping with devices that ensure the participation of power plants or the consumer in automatic or operational emergency control of power in the manner of rendering services in accordance with a separate agreement;

f) requirements for equipping with devices that ensure the participation of power plants in the normalized primary frequency control and in the secondary power control in the order of the provision of services in accordance with a separate agreement.

III. Criteria for the presence (absence) of the technical possibility of technological connection

15. The criteria for the availability of technical feasibility of technological connection are:

a) location of the power receiving device, in respect of which an application for technological connection has been submitted, within the territorial boundaries of the service of the relevant grid organization;

b) the absence of restrictions on the connected capacity in the network node to which technological connection is to be made.

In case of non-compliance with any of the specified criteria, there is no technical possibility of technological connection.

In order to verify the validity of the establishment by the grid organization of the fact of the lack of technical capability, the applicant has the right to apply to the authorized federal executive body for technological supervision to obtain an opinion on the presence (absence) of the technical capability of technological connection by the grid organization.

16. Restrictions on the connection of additional power arise if the full use of the consumed (generating) power of all previously connected consumers of electric power transmission services and the power of a newly connected power receiving device can lead to loading the power equipment of a grid organization in excess of the values ​​determined by technical standards and standards approved or adopted in the manner prescribed by the legislation of the Russian Federation.

17. If there is a restriction on the connection of new power, it is allowed to connect power receiving devices to electric networks within the power value that does not cause restrictions on the use of consumed (generating) power of all consumers of electric energy previously connected to this network node, or in the declared volume in agreement with the specified consumers.

The Zakonbase website provides a Decree of the Government of the Russian Federation of December 27, 2004 N 861 "On approval of the rules of non-discriminatory access to the services for transmitting electric energy and the provision of these services, the rules for non-discriminatory access to the services for operational dispatch management and the provision of these services, the rules NON-DISCRIMINATION ACCESS TO THE SERVICES OF THE ADMINISTRATOR OF THE WHOLESALE MARKET TRADING SYSTEM AND PROVISION OF THESE SERVICES AND THE RULES OF TECHNOLOGICAL CONNECTION OF POWER-RECEPTIONING DEVICES (POWER INSTALLATIONS) OF LEGAL ENTITIES AND INDIVIDUALS TO ELECTRIC NETWORKS" in the most recent edition. It is easy to comply with all legal requirements if you familiarize yourself with the relevant sections, chapters and articles of this document for 2014. To search for the necessary legislative acts on a topic of interest, you should use convenient navigation or advanced search.

On the Zakonbase website you will find a decree of the Government of the Russian Federation of December 27, 2004 N 861 "On approval of the rules of non-discriminatory access to the services for transmitting electric energy and the provision of these services, the rules of non-discriminatory access to the services for operational dispatch management and the provision of these services, OF THE RULES OF NON-DISCRIMINATION ACCESS TO THE SERVICES OF THE ADMINISTRATOR OF THE WHOLESALE MARKET TRADING SYSTEM AND THE PROVISION OF THESE SERVICES AND THE RULES OF TECHNOLOGICAL CONNECTION OF POWER-RECEPTIONING DEVICES (POWER INSTALLATIONS) OF LEGAL ENTITIES AND INDIVIDUALS TO THE ELECTRIC NETWORK full version in which all changes and amendments have been made. This guarantees the relevance and reliability of the information.

At the same time, download the Decree of the Government of the Russian Federation of December 27, 2004 N 861 "On the approval of the rules of non-discriminatory access to the services for transmitting electric energy and the provision of these services, the rules of non-discriminatory access to the services for operational dispatch management in the electric power industry and the provision of these services, the rules of non-discriminatory access TO THE SERVICES OF THE ADMINISTRATOR OF THE WHOLESALE MARKET TRADING SYSTEM AND THE PROVISION OF THESE SERVICES AND THE RULES OF TECHNOLOGICAL CONNECTION OF POWER-RECEPTION DEVICES (POWER INSTALLATIONS) OF LEGAL ENTITIES AND INDIVIDUALS TO THE ELECTRIC NETWORKS" can be completely free of charge, both in full and in separate chapters.

Russian Federation

Decree of the Government of the Russian Federation of December 27, 2004 N 861 (as amended on 06/09/2010) "On approval of the rules of non-discriminatory access to the services for transmitting electric energy and the provision of these services, the rules of non-discriminatory access to the services for operational dispatch management and the provision of these services , The rules of non -discriminatory access to the services of the administrator of the wholesale market and the provision of these services and the rules of technological accession of energy acceptance devices for consumers of electric energy, facilities for the production of electric energy, as well as electric grid facilities belonging to network organizations and other persons, to electric networks "


dated 08/31/2006 N 530 , dated 03/21/2007 N 168 , dated 07/26/2007 N 484 , dated 02/14/2009 N 118 , dated 02/14/2009 N 114 , dated 04/21/2009 N 334 , dated 06/15/2009 10/02/2009 N 785, dated 03/03/2010 N 117, dated 05/15/2010 N 341, dated 06/09/2010 N 416)

In order to promote the development of competition in the market for the production and sale of electrical energy, protect the rights of consumers of electrical energy and in accordance with Articles,, and the Federal Law "On the Electric Power Industry", the Government of the Russian Federation decides:

1. Approve the attached:

Rules for non-discriminatory access to electricity transmission services and provision of these services;

Rules for non-discriminatory access to services for operational dispatch control in the electric power industry and the provision of these services;

Rules for non-discriminatory access to the services of the wholesale market trading system administrator and the provision of these services;

Rules for the technological connection of power receivers of consumers of electric energy, facilities for the production of electric energy, as well as electric grid facilities owned by grid organizations and other persons, to electric networks.

dated 21.04.2009 N 334)

2. Designate the Federal Antimonopoly Service as the authorized federal executive body to ensure state control over compliance with the rules of non-discriminatory access to electric power transmission services, services for operational dispatch management in the electric power industry and the services of a trading system administrator.

Define the Federal Antimonopoly Service and Federal Service at tariffs within their powers by authorized federal executive bodies to ensure control over compliance with the rules for technological connection of power receiving devices of consumers of electric energy, electric power production facilities, as well as electric grid facilities owned by grid organizations and other persons to electric networks.

(As amended by Decree of the Government of the Russian Federation of April 21, 2009 N 334)

3. The Ministry of Industry and Energy of the Russian Federation, within 3 months, develop and approve a methodology for determining the normative and actual losses of electrical energy in electrical networks.

4. The Rules of Non-Discriminatory Access to Electricity Transmission Services and the Provision of These Services and the Rules for the Technological Connection of Power Receiving Devices of Electricity Consumers, Electricity Generation Facilities, and Electricity Grid Facilities Owned by Grid Companies and Other Persons to Electric Grids approved by this Resolution applied in the territory municipality the resort city of Sochi during the organization and holding of the XXII Olympic Winter Games and the XI Paralympic Winter Games in 2014, taking into account the specifics established by the Decree of the Government of the Russian Federation of May 15, 2010 N 341 technological connection and features of technological connection to power grid facilities of power receiving devices of consumers of electric energy in the territory of the municipality of the resort city of Sochi during the organization and holding of the XXII Olympic Winter Games and XI Paralympic Winter Games in 2014 and on amendments to some acts of the Government of the Russian Federation.

(as amended by Decree of the Government of the Russian Federation of 15.05.2010 N 341)

Prime Minister
Russian Federation
M. FRADKOV

APPROVED
Government Decree
Russian Federation
December 27, 2004
No. 861

(as amended by Decrees of the Government of the Russian Federation of 03/21/2007 N 168, of 07/26/2007 N 484, of 06/15/2009 N 492, of 10/02/2009 N 785, of 03/03/2010 N 117, of 06/09/2010 N 416)

(as amended by Decrees of the Government of the Russian Federation of March 21, 2007 N 168, of February 14, 2009 N 114)

1. These Rules define the general principles and procedure for ensuring non-discriminatory access of electric power industry entities and consumers of electric energy to services for operational dispatch control in the electric power industry (hereinafter referred to as services) provided by the system operator and other subjects of operational dispatch control (hereinafter referred to as the system operator), and how these services are provided.

(as amended by Decree of the Government of the Russian Federation No. 114 dated February 14, 2009)

Clause 2. - Has become invalid.

(as amended by Decree of the Government of the Russian Federation No. 114 dated February 14, 2009)

3. Non-discriminatory access to services provides for equal conditions for the provision of services to their consumers, regardless of their organizational and legal form and legal relations with the person providing these services.

4. The system operator is obliged to disclose information regarding access to services and the provision of services in accordance with the standards for information disclosure by subjects of the wholesale and retail electricity markets.

5. The system operator provides services to the subjects of the electric power industry and consumers of electric energy, which belong to the circle of persons subject to mandatory service by the system operator (hereinafter - consumers of services).

Subjects of the electric power industry and consumers of electric energy that are not related to the circle of persons subject to mandatory service by the system operator, the technological mode of operation and the operational state of electric power facilities or power receiving devices of which affect the electric power mode of operation of the energy system, conclude gratuitous agreements with the system operator. These agreements establish the procedure for the technological interaction of the system operator with the relevant subjects of the electric power industry and consumers of electric energy in order to ensure the reliable functioning of the energy system, including the technical requirements established by the system operator, necessary for managing the electric power mode of operation of the energy system, and the deadlines for meeting these requirements.

The procedure for the implementation of technological interaction of the system operator with the organization for managing the unified national (all-Russian) electric grid and other owners or other legal owners of electric grid facilities included in the unified national (all-Russian) electric grid, if this organization and other owners or other legal owners of these facilities, contracts have been concluded on the procedure for using such facilities, as well as the terms for the owners or other legal owners of such facilities to fulfill the technical requirements necessary for managing the electric power mode of operation of the energy system, are determined by agreements that are concluded (including on a tripartite basis) by these persons.

(as amended by Decree of the Government of the Russian Federation No. 114 dated February 14, 2009)

6. Services are provided on the basis of a bilateral agreement on the provision of services for operational dispatch control in the electric power industry (hereinafter - the agreement), concluded with consumers of services. At the same time, the system operator is not entitled to refuse the consumer of services to conclude such an agreement. The contract specifies the technical requirements established by the system operator that are necessary for him to manage the regimes of the Unified Energy System of Russia, as well as the deadline for their implementation.

7. Consumers of services enter into an agreement with the system operator before they conclude an agreement on the provision of services for the transmission of electric energy through a single national (all-Russian) electric grid with an organization for managing a unified national (all-Russian) electric grid.

(as amended by Decree of the Government of the Russian Federation No. 114 dated February 14, 2009)

8. The price of services is determined by prices (tariffs) or marginal (minimum and (or) maximum) levels of prices (tariffs) established by the federal executive body in charge of tariff regulation.

(as amended by Decree of the Government of the Russian Federation No. 114 dated February 14, 2009)

9. A person intending to conclude an agreement (hereinafter - the applicant) sends to the system operator in writing an application for providing access to services (hereinafter - the application), which must contain the following information, confirmed by the documents attached to the application:

a) details of the applicant;

b) a list of power plants owned by the applicant or on other legal grounds, indicating the installed generating capacity of each of them, as well as the average power supply of electric energy, which is calculated in accordance with the Rules for classifying electric power industry entities and consumers of electric energy as persons subject to obligatory service in the provision of services for operational dispatch control in the electric power industry, approved by Decree of the Government of the Russian Federation of February 14, 2009 N 114, - in relation to each power plant of the applicant, if such a power plant is included in the Unified Energy System of Russia, and the electric energy produced at it supplied to the retail market. This information is submitted by the applicant in accordance with the specified Rules;

c) points of connection of electric power facilities and power receivers of the applicant to the networks of the grid organization;

d) data on the state of the systems for exchanging technological information of the applicant with the dispatch centers of the subject of operational dispatch control in the electric power industry.

(as amended by Decree of the Government of the Russian Federation No. 114 dated February 14, 2009)

Clause 10. - Has become invalid.

(as amended by Decree of the Government of the Russian Federation No. 114 dated February 14, 2009)

11. The system operator is obliged to consider the application within 30 days from the date of its receipt and make a decision on granting access to services or refusing it.

12. In the absence of the information specified in paragraph 9 of these Rules, the system operator notifies the applicant about this within 3 days and, within 30 days from the date of receipt of the missing information, considers the application in accordance with paragraph 11 of these Rules.

13. If a decision is made to provide access to services, the system operator is obliged to send the draft contract signed by him to the applicant.

14. The applicant who has received the draft agreement signed by the system operator and has no objections to its terms, no later than 10 days "fills in that part of the agreement that concerns information about the applicant, signs it and sends the signed copy of the agreement to the system operator.

(as amended by Decree of the Government of the Russian Federation No. 114 dated February 14, 2009)

15. Paragraph 1 - Repealed.

(as amended by Decree of the Government of the Russian Federation No. 114 dated February 14, 2009)

The contract is considered concluded from the date of receipt by the person who sent the draft contract signed by him, signed by the other party to the contract, unless otherwise provided by this contract or a court decision.

16. If a decision is made to refuse to provide access to services, the system operator is obliged to send the applicant a written notice and a reasoned refusal no later than 30 days from the date of receipt of the application.

(as amended by Decree of the Government of the Russian Federation No. 114 dated February 14, 2009)

Refusal to provide access to services may be appealed to the antimonopoly body and (or) challenged in court.

17. The system operator has the right to refuse the applicant to provide access to services on the following grounds:

a) the applicant has not submitted the information provided for in paragraph 9 of these Rules;

b) the applicant provided false information;

c) the electric power facilities (power receiving devices) of the applicant are located outside the zone of dispatching responsibility of the system operator;

(as amended by Decree of the Government of the Russian Federation No. 114 dated February 14, 2009)

D) the applicant does not meet the criteria for classifying subjects of the electric power industry and consumers of electric energy as persons subject to mandatory service by the system operator.

(as amended by Decree of the Government of the Russian Federation No. 114 dated February 14, 2009)

18. The applicant has the right to re-apply to the system operator with an application. When the grounds specified in clause 17 of these Rules are eliminated, the system operator is not entitled to refuse the applicant to provide access to services.

In the event of a refusal to provide the applicant with access to services on the grounds provided for in subparagraph "d" of paragraph 17 of these Rules, if the technological mode of operation and the operational state of the electric power facilities or power receiving devices of the applicant affect the electric power mode of operation of the energy system, the system operator has the right to demand a conclusion with the applicant of the agreement provided for in paragraph 5 of these Rules. The agreement is concluded in the manner prescribed by these Rules for the conclusion of the contract.

(as amended by Decree of the Government of the Russian Federation No. 114 dated February 14, 2009)

19. As part of the provision of services under the contract, the system operator undertakes to carry out a set of organizational and technologically related actions to perform the functions of providing services provided for by the list of services approved by the Government of the Russian Federation of subjects of operational dispatch control in the electric power industry, prices (tariffs) for which are regulated by the state.

When executing the contract, the consumer of services is obliged to comply with the requirements established by the system operator, necessary for managing the electric power mode of operation of the energy system, the requirements stipulated by the contract, and pay for the services of the system operator within the terms stipulated by the contract.

(as amended by Decree of the Government of the Russian Federation No. 114 dated February 14, 2009)

20. Consumers of services have the right not to execute operational dispatching commands and orders if their execution endangers the life of people and the safety of equipment or leads to violation of the limits and conditions for the safe operation of nuclear power plants.

21. In the event of emergency electric power modes, the provision of services is carried out taking into account the specifics established by the legislation of the Russian Federation.

APPROVED
Government Decree
Russian Federation
December 27, 2004
No. 861

(as amended by Decrees of the Government of the Russian Federation of March 21, 2007 N 168, of June 9, 2010 N 416)

1. These Rules define the general principles and procedure for ensuring non-discriminatory access of the subjects of the wholesale electricity (capacity) market to services for organizing the operation of the trading system of the wholesale electricity (capacity) market of the administrator of the wholesale market trading system (hereinafter, respectively - wholesale market entities, services, administrator ), as well as the procedure for the provision of these services.

2. Non-discriminatory access to the services of an administrator provides for the provision of equal conditions for the provision of services to subjects of the wholesale market, regardless of their organizational and legal form and relations with the person providing these services.

3. The administrator is obliged to disclose information regarding access to services and their provision, in accordance with the standards for information disclosure by subjects of the wholesale and retail electricity markets.

4. The administrator is not entitled to refuse to provide services to wholesale market entities, except for the cases established by these Rules and the rules of the wholesale electricity (capacity) market.

5. Administrator services can be provided to persons who have received the status of a wholesale market entity in accordance with the rules of the wholesale electricity (capacity) market and who have provided the administrator with the documents and information provided for in paragraphs 6-8 of these Rules, as well as signed an agreement on joining the trading system of the wholesale market.

6. A legal entity wishing to gain access to the administrator's services (hereinafter referred to as the applicant), submits an application for this and submits to the administrator:

A) information on the type of wholesale market entity (supplier of electricity, energy sales organization, energy supply organization, guaranteeing supplier of electricity, consumer of electricity, etc.), to which the applicant corresponds, in accordance with the rules of the wholesale electricity (capacity) market of the transitional period;

b) the application form of the applicant, filled out in the prescribed form;

c) a notarized copy of constituent documents;

d) a notarized copy of the certificate of state registration of a legal entity;

E) a notarized copy of the certificate of the applicant's registration with the tax authorities of the Russian Federation;

E) documents confirming the powers of persons representing the interests of the applicant;

g) a document confirming that the applicant has been granted the status of a supplier of last resort in the manner and in the cases established by the legislation of the Russian Federation;

h) a single-line diagram of connection to an external electrical network, agreed with the owner or other legal owner of the network facilities to which the applicant or third parties whose interests he represents are technologically connected, indicating the names and voltage levels of the buses of external substations, proposed groups of supply points, places connection of commercial metering devices, measuring voltage transformers and the boundaries of the balance sheet, certified by representatives of adjacent owners of electrical networks;

i) acts of delimitation of balance sheet ownership and operational responsibility, agreed with the owners or other legal owners of grid facilities to which the applicant is technologically connected or third parties whose interests the applicant intends to represent, except when the connection is made in relation to power receiving devices (power plants) individuals;

(as amended by Decree of the Government of the Russian Federation of 09.06.2010 N 416)

J) documents confirming the existence of a duly concluded contract for the provision of services for the transmission of electrical energy (if the supplier (buyer) of electrical energy in accordance with the legislation of the Russian Federation is the payer under such an agreement);

k) consumers of electrical energy who buy a part of electrical energy in the retail electrical energy market (persons representing the interests of such consumers in the wholesale electrical energy (capacity) market), - a notarized copy of the contract concluded by an organization entitled to sell electricity in the retail market electrical energy, and the specified consumer of electrical energy, and containing a condition on the transfer to the consumer of electrical energy of the entire volume of electricity actually consumed by him or a condition on the obligation of the specified organization to conclude an agreement on the provision of services for the transmission of electrical energy in the interests of the consumer of electrical energy;

l) documents confirming that the subjects of the electric power industry have a duly concluded agreement on the provision of services for operational dispatch control (in the event that the supplier (buyer) of electric energy in accordance with the legislation of the Russian Federation is a payer under such an agreement);

m) passport technological characteristics of generating and power-receiving equipment, in respect of which the applicant plans to participate in the wholesale electricity (capacity) market;

n) documents confirming the provision of a communication system, including a data transmission system, with the system operator of the Unified Energy System of Russia and the administrator.

7. In order to obtain balanced data on the actual production (consumption) of electricity in the wholesale electricity (capacity) market, taking into account losses, as well as to make financial settlements in the wholesale electricity (capacity) market, the applicant also submits to the administrator in the form approved by the administrator, documents confirming:

a) ensuring commercial accounting of electricity (capacity) produced (consumed) on the wholesale market;

B) availability of a list of measuring instruments for commercial accounting of electric energy (capacity) agreed with related subjects of the wholesale market and methods of generating operational information agreed with the system operator.

8. The applicant, representing the interests of third parties in the wholesale electricity (capacity) market on the basis of the contracts concluded by them for the provision of services, contracts of agency, commission, purchase and sale, supply or other contracts, sends to the administrator information about the technological characteristics of the generating equipment of suppliers, interests which he represents, and (or) on the technological characteristics of the energy-receiving equipment of consumers whose interests he represents, as well as notarized copies of contracts, according to which the applicant represents the interests of third parties in the wholesale electricity (capacity) market.

The applicant, carrying out activities for the transmission of electrical energy and buying electrical energy on the wholesale market of electrical energy (capacity), in order to compensate for losses in electrical networks, submits to the administrator the characteristics of the electrical network and network facilities for each group of supply points (grid facility).

In order to obtain data on the actual production and consumption of energy, as well as to carry out settlements on the wholesale electricity (capacity) market, the applicant shall submit documents evidencing the compliance of the commercial metering system with the mandatory technical requirements and terms of the agreement on joining the trading system of the wholesale market, in the manner set by the administrator.

The administrator is not entitled to require the applicant to provide information that is not provided for by these Rules, unless otherwise provided by the legislation of the Russian Federation.

In order to ensure equal access to the services of the administrator, the owner or other legal owner of the grid facilities to which the applicant is technologically connected or third parties whose interests he represents, is obliged, within 30 days from the date of receipt of these documents, to agree on a single-line diagram of connection to the external electrical network and issue acts of delimitation of balance sheet ownership and responsibility.

(as amended by Decree of the Government of the Russian Federation of 09.06.2010 N 416)

The subjects of the wholesale market adjacent to the applicant, within 30 days from the date of receipt of the specified documents, are obliged to agree with him the documents confirming the provision of commercial accounting of electricity (capacity) produced (consumed) in the wholesale market, the procedure for information exchange and the procedure for using commercial metering devices to determine volumes production (consumption) of electric energy (capacity) at the borders of the balance sheet ownership of wholesale market entities.

(as amended by Decree of the Government of the Russian Federation of 09.06.2010 N 416)

The location of one or more supply points within the boundaries of the balance sheet ownership (operational responsibility) of the electric grid facilities of the electric power industry entity or consumers of electric energy in cases provided for by the Rules of the wholesale electricity (capacity) market of the transitional period is not a reason for the adjacent wholesale market entity to refuse to agree on the list measuring instruments for commercial accounting of electric energy (power). At the same time, the wholesale market entity, the group of supply points of which includes such supply points, is obliged to provide access to the adjacent wholesale market entity to measuring instruments to verify the reliability of their readings.

(as amended by Decree of the Government of the Russian Federation of 09.06.2010 N 416)

9. The administrator has the right to refuse the applicant access to the services of the administrator, if he:

A) did not submit the documents and information provided for in paragraph 6 of these Rules;

B) provided false information;

c) does not comply with any of the requirements established by the legislation of the Russian Federation for wholesale market entities;

d) failed to comply with the requirements established by the agreement on accession to the trading system of the wholesale market.

10. The applicant has the right to apply to the administrator with an application for granting access to its services when the grounds for denying the applicant access to the services of the administrator are eliminated.

11. The decision to refuse access to the administrator's services may be appealed in the manner prescribed by the legislation of the Russian Federation.

12. The administrator provides services to wholesale market entities on the basis of an agreement on accession to the wholesale market trading system.

A signed copy of the agreement on joining the trading system of the wholesale market is sent by the administrator to the wholesale market entity.

13. Services of the administrator are paid by the wholesale market entity at the rates approved by the federal executive body in the field of state regulation of rates.

14. If the wholesale market entity fails to pay for the services of the administrator, the administrator has the right to suspend the acceptance of applications from the wholesale market entity for participation in the procedure for the competitive selection of price bids on the wholesale market or to apply other measures provided for by the agreement on joining the wholesale market trading system until the debt is fully repaid.

15. The administrator has the right to terminate the provision of services to the wholesale market entity in the event of:

A) non-compliance of a legal entity with the requirements for a wholesale market entity;

b) loss by a legal entity of the status of a wholesale market entity;

C) repeated non-fulfillment (improper fulfillment) by the wholesale market entity of obligations to pay for the services of the administrator;

d) termination of the agreement on accession to the trading system of the wholesale market;

e) termination of activities of the wholesale market entity on the grounds provided for by the legislation of the Russian Federation.

16. The adoption by the administrator, in accordance with the rules of the wholesale electricity (capacity) market and the agreement on joining the trading system of the wholesale market, of the decision to recognize the failed sale (purchase) of electricity on the wholesale market or in any limited territory cannot be considered as a failure or improper fulfillment of obligations for the provision of administrator services.

---

It does not work Edition from 31.08.2006

Document nameDecree of the Government of the Russian Federation of December 27, 2004 N 861 (as amended on 31.08.2006) "On approval of the rules of non-discriminatory access to the services for transmitting electric energy and the provision of these services, the rules of non-discriminatory access to the services for operational dispatch management and the provision of these services , RULES OF NON-DISCRIMINATION ACCESS TO THE SERVICES OF THE ADMINISTRATOR OF THE WHOLESALE MARKET TRADING SYSTEM AND PROVISION OF THESE SERVICES AND THE RULES OF TECHNOLOGICAL CONNECTION OF POWER-RECEPTIONING DEVICES (POWER INSTALLATIONS) OF LEGAL ENTITIES AND INDIVIDUALS TO ELECTRIC NETWORKS"
Type of documentdecree, rules
Host bodyRussian government
Document Number861
Acceptance date01.01.1970
Revision date31.08.2006
Date of registration in the Ministry of Justice01.01.1970
StatusIt does not work
Publication
  • This document has not been published in this form.
  • Document in electronic form FAPSI, STC "System"
  • (as amended on December 27, 2004 - "Rossiyskaya Gazeta", N 7, January 19, 2005;
  • "Collection of Legislation of the Russian Federation", N 52, 12/27/2004, part 2, art. 5525)
NavigatorNotes

Decree of the Government of the Russian Federation of December 27, 2004 N 861 (as amended on 31.08.2006) "On approval of the rules of non-discriminatory access to the services for transmitting electric energy and the provision of these services, the rules of non-discriminatory access to the services for operational dispatch management and the provision of these services , RULES OF NON-DISCRIMINATION ACCESS TO THE SERVICES OF THE ADMINISTRATOR OF THE WHOLESALE MARKET TRADING SYSTEM AND PROVISION OF THESE SERVICES AND THE RULES OF TECHNOLOGICAL CONNECTION OF POWER-RECEPTIONING DEVICES (POWER INSTALLATIONS) OF LEGAL ENTITIES AND INDIVIDUALS TO ELECTRIC NETWORKS"

In order to promote the development of competition in the market for the production and sale of electrical energy, protect the rights of consumers of electrical energy and in accordance with Articles,, and the Federal Law "On the Electric Power Industry", the Government of the Russian Federation decides:

1. Approve the attached:

Rules for non-discriminatory access to electricity transmission services and provision of these services;

Rules for non-discriminatory access to services for operational dispatch control in the electric power industry and the provision of these services;

Rules for non-discriminatory access to the services of the wholesale market trading system administrator and the provision of these services;

Rules for the technological connection of power receiving devices (power plants) of legal entities and individuals to electric networks.

2. Designate the Federal Antimonopoly Service as the authorized federal executive body to ensure state control over compliance with the rules of non-discriminatory access to electric power transmission services, services for operational dispatch management in the electric power industry and the services of a trading system administrator.

3. The Ministry of Industry and Energy of the Russian Federation, within 3 months, develop and approve a methodology for determining the normative and actual losses of electrical energy in electrical networks.

Prime Minister
Russian Federation
M. FRADKOV

APPROVED
Government Decree
Russian Federation
December 27, 2004
No. 861

RULES OF NON-DISCRIMINATION ACCESS TO AND PROVISION OF ELECTRICITY SERVICES

dated 31.08.2006 N 530)

I. General provisions

1. These Rules define the general principles and procedure for ensuring non-discriminatory access to electricity transmission services, as well as the provision of these services.

2. The terms used in these Rules mean the following:

"territorial distribution network" - a complex of power transmission lines and equipment that are not part of the unified national (all-Russian) electrical network, used to provide services for the transmission of electrical energy;

Grid organizations" - organizations that own, on the basis of ownership or on another basis established by federal laws, electric grid facilities, with the use of which such organizations provide services for the transmission of electric energy, and also carry out, in accordance with the established procedure, technological connection of power receiving devices (power installations) legal and physical persons to electric networks;

(As amended by Decree of the Government of the Russian Federation of 31.08.2006 N 530)

"point of connection to the electrical network" - the place of physical connection of the power receiver (power plant) (hereinafter referred to as the power receiver) of the consumer of services for the transmission of electrical energy (hereinafter referred to as the consumer of services) with the electrical network of the grid organization;

"capacity of the electrical network" - technologically the maximum allowable value of power that can be transferred, taking into account the operating conditions and reliability parameters of the operation of electric power systems;

"balance sheet ownership boundary" - a line for dividing power grid facilities between owners on the basis of ownership or possession on a different legal basis.

Other concepts used in these Rules correspond to the concepts defined by the legislation of the Russian Federation.

3. Non-discriminatory access to electricity transmission services provides for equal conditions for the provision of these services to their consumers, regardless of the legal form and legal relationship with the person providing these services.

4. Grid organizations are obliged to disclose information regarding access to electricity transmission services and the provision of these services in accordance with the standards for information disclosure by wholesale and retail electricity market entities.

Clause 5 - Repealed.

(As amended by Decree of the Government of the Russian Federation of 31.08.2006 N 530)

6. Services for the transmission of electrical energy are provided by the grid organization on the basis of an agreement on the provision of paid services for the transmission of electrical energy to persons who have, on the right of ownership or on another legal basis, power receiving devices and other objects of the electric power industry, technologically connected in the prescribed manner to the electrical network, as well as entities of the wholesale electricity market that export (import) electricity, energy sales organizations and guaranteeing suppliers.

Persons owning on the right of ownership or on another legal basis the objects of the electric grid economy, to which the power receiving devices of consumers of services are connected, provide services for the transmission of electric energy to these consumers on a reimbursable contractual basis. The specified persons participate in relations for the provision of services for the transmission of electrical energy to consumers of services in accordance with the provisions of these Rules, provided for grid organizations.

(As amended by Decree of the Government of the Russian Federation of 31.08.2006 N 530)

The activity of a consumer (producer) of electric energy using electric energy when renting out residential and non-residential premises belonging to him, renting them out and (or) operating or transferring them to third parties on other legal grounds is not recognized as the provision of services for the transmission of electrical energy.

(As amended by Decree of the Government of the Russian Federation of 31.08.2006 N 530)

In the event that the power receiving devices of the consumer of services are connected to the electric networks of a grid organization through the power plants of electric energy producers or are connected to ownerless electric grid facilities, an agreement on the provision of services for the transmission of electric energy (hereinafter referred to as the agreement) is concluded with the grid organization to which networks are connected power plants of the indicated manufacturers or ownerless power grid facilities.

(As amended by Decree of the Government of the Russian Federation of 31.08.2006 N 530)

Consumers of services connected to the electric grids of a grid organization through the power plants of electric power plants pay for electric power transmission services at tariffs established in accordance with methodological guidelines approved by the federal executive authority on tariffs.

(As amended by Decree of the Government of the Russian Federation of 31.08.2006 N 530)

7. In order to ensure the fulfillment of its obligations under contracts to consumers of services - buyers and sellers of electrical energy - a grid organization enters into contracts with other grid organizations whose electric grid facilities have technological connection to electric grid facilities owned or on other legal grounds by of this grid organization (hereinafter - related grid organizations), in accordance with Section II.1 of these Rules.

(As amended by Decree of the Government of the Russian Federation of 31.08.2006 N 530)

8. During the transitional period of operation of the electric power industry, the provision of services for the transmission of electric energy using facilities included in the unified national (all-Russian) electric grid is carried out on the basis of an agreement concluded both on behalf of the organization for managing the unified national (all-Russian) electric grid, and on behalf of on behalf of other owners of the said objects.

II. The procedure for concluding and executing the contract

9. The agreement is public and is obligatory for the conclusion for the network organization.

Unreasonable evasion or refusal of the grid organization to conclude an agreement may be appealed by the consumer of services in the manner prescribed by the legislation of the Russian Federation.

10. An agreement cannot be concluded before the conclusion of an agreement on the implementation of technological connection of power receiving devices (power plants) of legal entities and individuals to electric networks, except for cases when the consumer of services is:

a person whose power receiving device was technologically connected to the electrical network before the entry into force of these Rules;

a person who exports (imports) electric energy and does not own, use and dispose of electric power facilities connected to the electric grid;

an energy sales organization (guaranteeing supplier) that concludes an agreement in the interests of electric energy consumers served by it.

In relation to these persons, the grid organization has the right, in order to determine the technical characteristics of power receiving devices (power installations) necessary for the provision of services for the transmission of electrical energy, to request information and documentation necessary for technological connection.

11. Within the framework of the agreement, the grid organization undertakes to carry out a set of organizational and technologically related actions that ensure the transmission of electric energy through the technical devices of electric networks, and the consumer of services - to pay for them.

12. The contract must contain the following essential conditions:

the value of the maximum power of the power receiving device connected to the electrical network, with the distribution of the specified value for each point of connection of the electrical network, in respect of which technological connection was carried out in accordance with the procedure established by the legislation of the Russian Federation;

the amount of power (generating or consumed), within which the grid organization assumes the obligation to ensure the transmission of electric energy at the points of connection specified in the contract;

the responsibility of the consumer of services and the grid organization for the condition and maintenance of electric grid facilities, which is determined by their balance sheet ownership and is fixed in the act of delimitation of the balance sheet ownership of electric grids and the operational responsibility of the parties attached to the contract;

the value of technological and emergency armor (for consumers - legal entities or entrepreneurs without forming a legal entity that meet the relevant requirements established by the legislation of the Russian Federation in the field of electric power industry), which must be taken into account when determining the procedure for limiting the power consumption mode. For these persons, the act of approval of emergency and technological armor is a mandatory annex to the contract;

the obligations of the parties to equip points of connection with electrical energy measuring instruments, including measuring instruments that meet the requirements established by the legislation of the Russian Federation, as well as to ensure their operability and compliance with operational requirements for them during the entire term of the contract, established by the authorized body for technical regulation and metrology and the manufacturer, or the calculation method for metering electrical energy, used in the absence of metering devices.

(As amended by Decree of the Government of the Russian Federation of 31.08.2006 N 530)

13. The consumer of services assumes the following obligations in accordance with the contract:

pay the grid organization services for the transmission of electrical energy in the terms and amounts established by the contract;

maintain in his possession or on another legal basis relay protection and emergency automation, electricity and power meters, as well as other devices necessary to maintain the required parameters of reliability and quality of electricity, and comply with the requirements for the entire term of the contract , established for technological connection and in the rules for the operation of these facilities, instruments and devices;

submit to the grid organization, within the terms established by the contract, the necessary technological information: main electrical diagrams, equipment characteristics, diagrams of relay protection devices and emergency automation, operational data on the technological modes of operation of the equipment;

inform the grid organization within the terms established by the contract about emergency situations at energy facilities, scheduled, current and major repairs at them;

inform the grid organization about the scope of participation in automatic or operational emergency control of power, in normalized primary frequency control and in secondary power control (for power plants), as well as on the list and power of current collectors of the consumer of services that can be turned off by emergency control devices;

fulfill obligations to ensure the safety of operation of the energy networks under their control and the serviceability of the instruments and equipment used by them related to the transmission of electrical energy;

freely allow authorized representatives of the grid organization to control and record the quantity and quality of the transmitted electric energy in the manner prescribed by the contract.

14. The grid organization assumes the following obligations in accordance with the contract:

ensure the transmission of electrical energy to the power receiving devices of the consumer of services, the quality and parameters of which must comply with technical regulations and other mandatory requirements;

to carry out the transmission of electrical energy in accordance with the agreed reliability parameters, taking into account the technological characteristics of power receiving devices (power plants);

in the manner and terms established by the contract, inform the consumer of services about emergency situations in electrical networks, repair and maintenance work that affect the fulfillment of obligations under the contract;

freely allow authorized representatives of consumers of services to control and record the quantity and quality of the transmitted electric energy in the manner prescribed by the contract.

14.1. Consumers of services - buyers of electrical energy must comply with the ratio of active and reactive power consumption, defined in the contract in accordance with the procedure approved by the federal executive body responsible for developing state policy in the field of the fuel and energy complex. These characteristics are determined by:

a network organization for consumers of services connected to electric networks with a voltage of 35 kV and below;

A grid organization together with the relevant subject of operational dispatch control for consumers of services connected to electric networks with voltages above 35 kV.

In the event that the consumer of services deviates from the values ​​of the ratio of active and reactive power consumption established by the contract as a result of participation in the regulation of reactive power under an agreement with the grid organization, he pays for the services for the transmission of electrical energy, including as part of the final tariff (price) for electrical energy supplied to him under an energy supply agreement, taking into account the reduction factor established in accordance with the guidelines approved by the federal executive authority for tariffs.

In the event that the consumer of services does not comply with the values ​​of the ratio of active and reactive power consumption established by the contract, except when this was the result of the execution of dispatcher commands or orders of the subject of operational dispatch control or was carried out by agreement of the parties, he installs and maintains devices that provide reactive power regulation, or pays for electricity transmission services, including as part of the final tariff (price) for electricity supplied to him under an energy supply agreement, taking into account the corresponding multiplying factor.

Upon detection by the network organization, based on the readings of metering devices, violations of the values ​​​​of the ratio of consumption of active and reactive power, an act is drawn up, which is sent to the consumer of services. The consumer of services, within 10 working days from the date of receipt of the act, notifies in writing of the period during which he will ensure compliance with the established characteristics by self installation devices providing reactive power regulation, or on the impossibility to fulfill the specified requirement and consent to the application of a multiplying factor to the cost of services for the transmission of electric energy. The specified period cannot exceed 6 months. If, after 10 working days, the notification is not sent by the consumer of services, the grid organization, as well as the guaranteeing supplier (power supply organization, energy sales organization) under the power supply agreement apply a multiplying factor to the tariff for electric power transmission services (including as part of the final tariff (prices) for electricity). The multiplying factor is applied before the installation of the relevant devices by the service consumer, who has violated the values ​​of the ratio of active and reactive power consumption.

Losses incurred by the grid organization or third parties in connection with the violation of the established values ​​​​of the ratio of active and reactive power consumption are compensated by the person who committed such a violation in accordance with the civil legislation of the Russian Federation.

(As amended by Decree of the Government of the Russian Federation of 31.08.2006 N 530)

14.2. In the event that relay protection devices, emergency and regime automation and (or) its components are installed on power receiving devices of consumers of services, their safety and reliable functioning, as well as the possibility of timely implementation of control actions in accordance with the requirements of the system operator (the subject of operational dispatch control of a technologically isolated territorial electric power system) are provided by the grid organization, unless the contract provides that the consumer of services performs these actions independently.

If, when the consumer of services and the grid organization concluded an agreement on the implementation of technological connection to electric networks, the technical specifications for technological connection did not include requirements for equipping power receiving devices of the consumer of services with relay protection devices, emergency and regime automation, including devices that provide remote input of temporary shutdown schedules consumption from dispatch centers, the relevant conditions are stipulated by the contract concluded by the same parties. Measures to equip power receiving devices of consumers of services with devices of relay protection, emergency and regime automation in accordance with the requirements of the relevant subject of operational dispatch control are carried out by the grid organization, unless otherwise established by agreement of the parties, on the basis of an agreement.

In the event that the consumer of services fails to comply with the terms of the contract relating to the operation of relay protection devices, emergency and regime automation, the grid organization has the right to suspend the fulfillment of its obligations under the contract or refuse to fulfill them.

(As amended by Decree of the Government of the Russian Federation of 31.08.2006 N 530)

15. A person who intends to conclude an agreement (hereinafter referred to as the applicant) sends an application in writing to the grid organization for the conclusion of an agreement, which must contain the following information:

Details of the consumer of services for the transmission of electrical energy; volumes and expected mode of transmission of electrical energy, broken down by months;

the volume of maximum power and the nature of the load of power receiving devices (power plants) connected to the network (generating or consumed), with its distribution over each point of connection of the electrical network and indicating the boundaries of the balance sheet;

single-line diagram of the electrical network of the consumer of services connected to the networks of the grid organization;

points of connection to the networks of a grid organization indicating for each of the points of connection to the network the values ​​of the declared power, including the values ​​of power during the period of maximum loads of consumers of electric energy;

the date of commencement of the provision of services for the transmission of electrical energy;

reference to an agreement on the provision of services for operational dispatch control (in the case of an agreement on the provision of services for the transmission of electric energy with an organization for the management of a unified national (all-Russian) electric grid).

16. The grid organization, within 30 days from the date of receipt of the application for concluding an agreement, is obliged to consider it and send to the applicant a draft agreement signed by the grid organization or a reasoned refusal to conclude it.

17. If the information specified in paragraph 15 of these Rules is missing, the grid organization notifies the applicant about this within 6 working days and, within 30 days from the date of receipt of the missing information, considers the application in accordance with paragraph 16 of these Rules.

18. An applicant who has received a draft agreement from a grid organization shall fill it out in the part relating to the information about the applicant included in the agreement and send one copy of the agreement to the grid organization signed by him.

19. The contract is considered concluded from the date of its signing by the applicant, unless otherwise provided by the contract or a court decision.

20. The grid organization has the right to refuse to conclude an agreement in the event of:

the consumer of services does not have a concluded agreement on the provision of services for operational dispatch control (in the case of the conclusion of an agreement on the provision of services for the transmission of electric energy with an organization for the management of a unified national (all-Russian) electric grid);

lack of technical feasibility to provide services for the transmission of electrical energy in the declared volume (if the declared amount of power, the proper transmission of which cannot be ensured by the grid organization based on the existing conditions of technological connection);

sending an application for the conclusion of an agreement by a person who does not have a technological connection to the electric networks of this grid organization. At the same time, a prerequisite for concluding an agreement with last resort suppliers and energy sales organizations is the presence of a technological connection of consumers of electric energy, in whose favor the agreement is concluded, and for organizations engaged in the export-import of electric energy, the presence of a connection of the electric networks of this grid organization with electric networks neighboring states, through whose territories export-import deliveries of electric energy are carried out.

If several organizations participating in the tender for the right to operate as a supplier of last resort apply to conclude a contract, the contract is concluded with each of the applied organizations. The date of commencement of the provision of services under the contract cannot be earlier than the date from which the status of a supplier of last resort will be assigned to the relevant organization.

(As amended by Decree of the Government of the Russian Federation of 31.08.2006 N 530)

21. If it is not technically possible to provide services for the transmission of electric energy within the volume declared by the consumer of services, the grid organization is obliged to notify the applicant within 30 days of the conditions and to what extent the service can be provided and the contract is concluded.

22. If there are grounds for refusal to conclude an agreement, the grid organization is obliged, no later than 30 days from the date of receipt of the application specified in paragraph 15 of these Rules, to send to the applicant in writing a reasoned refusal to conclude an agreement with supporting documents attached.

Refusal to conclude an agreement may be challenged in the manner prescribed by the legislation of the Russian Federation.

23. A prerequisite for the provision of services for the transmission of electrical energy to a consumer of services is that he has the status of a participant in the wholesale market or a contract for the purchase and sale of electrical energy concluded with a supplier of last resort, an energy sales organization or another supplier of electrical energy.

24. The grid organization has the right to suspend the transmission of electric energy in the following cases:

occurrence of debt of the consumer of services for payment for services for the transmission of electric energy for 2 or more billing periods;

Violation by the consumer of services of the terms of payment determined by the contract for the sale (supply) of electric energy concluded by him, the contract for energy supply or the agreement on joining the trading system of the wholesale market of electric energy (capacity), - if there is a corresponding notification (in writing) from the administrator of the trading system, a supplier of last resort or an energy sales organization, indicating the amount of debt of the consumer of services, the deadline for its repayment, as well as the expected date for the introduction of restrictions on the consumption regime;

(As amended by Decree of the Government of the Russian Federation of 31.08.2006 N 530)

connection by the consumer of services to the electrical network of power receiving devices (power installations) that do not comply with the terms of the contract, or connection carried out in violation of the procedure for technological connection of power receiving devices of legal entities and individuals to electric networks;

24.1. If the consumer of services (including the energy sales organization) requires the installation of metering devices at the electric grid facilities owned by the grid organization, the consumer of services has the right to send an application to the network organization about the need to equip the point of supply with metering devices indicating the point of supply to be equipped and the necessary technical requirements to measuring instruments.

The grid organization considers the said application and, within no more than 15 working days from the date of its receipt, sends to the applicant a document containing technical specifications for carrying out work on equipping the point of supply with measuring instruments (indicating the time and cost of performing the relevant work), or a justified refusal to due to the technical impossibility of installing the necessary metering devices. Specifications cannot include work that is not directly related to the installation of metering devices.

The applicant agrees with the network organization on the terms and cost of work within no more than 10 working days from the date of receipt of the relevant document.

The term for the performance of work cannot exceed 3 months from the date of approval of the technical specifications, if the installation of metering devices does not require the creation of new electric grid facilities and the introduction of restrictions on the consumption regime for other consumers.

If the applicant agrees with the terms and cost of work, the grid organization performs work on equipping the declared point of delivery with metering devices and assumes obligations to ensure proper maintenance of the installed metering devices, unless otherwise provided by the relevant contract.

In case of disagreement of the applicant with the terms and cost of work, as well as in case of violation by the grid organization of the deadlines for the performance of work, the applicant has the right, in agreement with the grid organization, independently or with the involvement of third parties, to carry out work on equipping the point of supply with metering devices.

The operation of metering devices owned by the consumer of services or a third party involved by him to carry out work on equipping the point of supply with metering devices is carried out at the expense of the owner of these devices.

The applicant has the right to challenge the refusal of the network organization to install metering devices, the technical conditions for their installation or the requirements set by the network organization for persons performing work on its network equipment, in accordance with the procedure established by the legislation of the Russian Federation.

(As amended by Decree of the Government of the Russian Federation of 31.08.2006 N 530)

Clause 25 - Repealed.

(As amended by Decree of the Government of the Russian Federation of 31.08.2006 N 530)

26. Suspension of the transmission of electrical energy does not entail termination of the contract.

When the transmission of electrical energy is suspended on the grounds provided for in paragraph 24 of these Rules, consumers of services may partially or completely limit the mode of consumption of electrical energy in the prescribed manner.

The consumer of services cannot be limited in the consumption of electrical energy less than the amount of power established in the act of harmonization of emergency and technological armor, with the exception of cases established by the legislation of the Russian Federation.

Clause 27 - Repealed.

(As amended by Decree of the Government of the Russian Federation of 31.08.2006 N 530)

28. An agreement concluded for a certain period shall be considered extended for the same period and under the same conditions, if before the expiration of its validity neither party declares its termination, amendment or conclusion of a new agreement.

If one of the parties before the expiration of the contract has made a proposal to conclude a new contract, then the relations of the parties before the conclusion of a new contract are regulated in accordance with the terms of the previously concluded contract.

If the grid organization has grounds for unilateral termination of the contract with the last resort supplier (energy sales organization) due to its failure to fulfill its obligations to pay for the relevant services, the grid organization is obliged, within 10 days from the moment the grounds arise, to send a notification to consumers of electric energy in whose interests it acts on the forthcoming termination of the contract and a proposal to conclude an agreement directly with the grid organization.

Termination of the contract does not entail the disconnection of the power receiving device of the consumer of services from the electrical network.

(As amended by Decree of the Government of the Russian Federation of 31.08.2006 N 530)

Clause 29 - Repealed.

(As amended by Decree of the Government of the Russian Federation of 31.08.2006 N 530)

II.1. The procedure for concluding and executing contracts between related grid organizations

(As amended by Decree of the Government of the Russian Federation of 31.08.2006 N 530)

29.1. Under an agreement between related grid organizations, one party to the agreement undertakes to provide the other party with services for the transmission of electric energy using the electric grid facilities owned by it or on another legal basis (to provide electrical connections within the value of the connected (declared) capacity at the corresponding point of connection and carry out the transmission of electric energy to the point of connection of the power grid facilities of the other party to the electric networks of this grid organization), and the other party undertakes to pay for these services or to mutually provide services for the transmission of electric energy. The service is provided within the limits of the connected (declared) capacity at the corresponding point of technological connection of electric grid facilities of one grid organization to the facilities of another grid organization. The consumer of services provided under such an agreement is determined in accordance with clause 29.8 of these Rules.

29.2. When concluding an agreement between adjacent grid organizations, the parties determine the objects of the electric grid economy that belong to them on the basis of ownership or on another legal basis, in respect of which mutual coordination of changes in the operational state, repair work, modernization and other measures is necessary (hereinafter referred to as the objects of interconnection coordination). The list of inter-grid coordination objects is an integral part of the agreement between adjacent grid organizations.

The list of objects of inter-network coordination indicates the party performing the change (coordinating the implementation of the change) in the operational state of each object included in the specified list.

The list of inter-grid coordination objects does not include power grid facilities that are contained in the lists of dispatchable objects of the dispatch centers of the system operator or other subjects of operational dispatch control.

Determination of one of the network organizations as an organization that performs changes (coordinates the implementation of changes) in the operational state of inter-grid coordination objects does not affect the price of the contract between adjacent grid organizations.

29.3. A grid organization is not entitled to refuse to conclude an agreement with an adjacent grid organization.

Contracts between related grid organizations are concluded in accordance with the civil legislation of the Russian Federation and the legislation of the Russian Federation on the electric power industry, taking into account the specifics established by these Rules.

In case of unjustified refusal or evasion of the grid organization from concluding the contract, the other party has the right to apply to the court with a demand for compulsion to conclude the contract and compensation for the losses caused to it.

29.4. The term of validity of the agreements provided for by this section, concluded with other owners of electric grid facilities that are part of the unified national (all-Russian) electric grid, other than the organization for managing the unified national (all-Russian) electric grid, is limited to the transitional period of reforming the electric power industry. Relations associated with the further use by such persons of the electric grid facilities included in the unified national (all-Russian) electric grid are regulated on the basis of agreements on the procedure for using the electric grid facilities included in the unified national (all-Russian) electric grid.

At the end of the transitional period of reforming the electric power industry, relations for the provision of services for the transmission of electric energy using electric grid facilities included in the unified national (all-Russian) electric grid are settled with the organization for managing the unified national (all-Russian) electric grid, with the exception of those determined in accordance with article 7 of the Federal Law "On the Electric Power Industry" cases where contracts for the provision of services for the transmission of electrical energy using these facilities are concluded by the owners of such facilities independently.

Relations related to the provision of services for the transmission of electrical energy using power grid facilities owned by the federal state unitary enterprise "Russian State Concern for the Production of Electrical and Thermal Energy at Nuclear Power Plants" are settled on the basis of an agreement with the organization for managing the unified national (all-Russian) electrical network.

29.5. The agreement between adjacent grid organizations must contain the following essential conditions:

the value of the connected (declared) power, within which the relevant party undertakes to ensure the transmission of electrical energy at the relevant point of connection;

the responsibility of the parties to the contract for the condition and maintenance of electric grid facilities, which is fixed in the act attached to the contract to distinguish between the balance sheet ownership of electric networks and the operational responsibility of the parties;

the procedure for making payments for services rendered, taking into account the specifics specified in clause 29.8 of these Rules;

Technical characteristics of connection points of power grid facilities owned by the parties to the agreement, including their capacity;

A list of objects of inter-grid coordination, indicating in it for each object the party performing changes (coordinating the implementation of changes) of its operational state, as well as the procedure for ensuring coordination of the parties' actions when performing such changes and repair work.

29.6. An agreement between adjacent grid organizations may also regulate the following conditions:

conditions for maintaining the parameters of reliability of power supply and quality of electric energy that meet the mandatory requirements, including the conditions for the parallel operation of electric networks owned by the parties to the contract, the procedure for equipping electric grid facilities owned by the parties to the contract with devices of relay protection, emergency and regime automation (if they are not available) and the procedure for interaction between the parties to the contract when setting up and using them;

the procedure for equipping electric grid facilities owned by the parties to the contract with metering devices for electric energy and power and metering electric energy flows through the points of connection of electric grid facilities owned by the parties to the agreement;

The procedure for mutual notification by the parties to the agreement of actions that may have consequences for the technological modes of operation of the power grid facilities of the other party, including the procedure for agreeing and mutual notification of repair and maintenance work at the power grid facilities;

the procedure for interaction between the parties to the agreement in the event of the occurrence and elimination of technological violations in the operation of power grid facilities belonging to the parties;

The scope and procedure for the provision by the parties to the contract of the necessary technological information: electrical circuits, equipment characteristics, data on its operating modes and other data necessary to fulfill the terms of the contract.

29.7. Grid organizations in the performance of the contract provided for by this section are obliged to:

ensure the working condition and compliance with the mandatory requirements for the operation of relay protection devices, emergency and regime automation, electric energy and power meters, as well as other devices necessary to maintain the required parameters of reliability and quality of electric energy ;

timely inform the other party to the agreement about the occurrence (threat of occurrence) of emergency situations in the operation of their electric grid facilities, as well as about repair and maintenance work carried out at these facilities;

freely allow authorized representatives of the other party to the contract to control and record the quantity and quality of the transmitted electric energy.

29.8. The consumer of services under an agreement between adjacent grid organizations is defined as follows:

when executing an agreement between the owners of electric grid facilities included in the unified national (all-Russian) electric grid and territorial grid organizations, the consumer of services is the territorial grid organization;

when executing an agreement between the organization for managing the unified national (all-Russian) electric grid and other owners of electric grid facilities included in the unified national (all-Russian) electric grid, the consumer of services is other owners of the electric grid facilities included in the unified national (all-Russian) electric grid;

when executing an agreement between territorial grid organizations serving consumers located in the territories of different constituent entities of the Russian Federation, the consumer of services is that of the two adjacent grid organizations, to whose electric networks following the results of the previous regulation period, electric energy was transferred in a larger volume than was released from its networks, while the cost of services rendered is determined in accordance with methodological guidelines approved by the federal executive authority for tariffs;

when executing an agreement between territorial grid organizations serving consumers located on the territory of one subject of the Russian Federation, the parties to the agreement provide mutual services for the transmission of electric energy, while both parties are consumers of services. When setting tariffs for electric energy transmission services for 2008 and subsequent years, tariff rates are determined taking into account the need to ensure equality of tariffs for electric energy transmission services for all consumers of services located on the territory of the corresponding subject of the Russian Federation and belonging to the same group (category) from among those for which the legislation of the Russian Federation provides for differentiation of tariffs for electrical energy (capacity). According to the decision of the federal executive authority on tariffs, adopted at the request of the authorized executive authorities of the constituent entities of the Russian Federation in the field of state regulation of tariffs, this norm can be applied when setting tariffs for 2007.

Settlements under the agreement concluded by the territorial grid organizations in accordance with this section are carried out at the tariff for electric power transmission services, which is determined in accordance with the methodological guidelines approved by the federal executive authority for tariffs, in relation to each of the parties to such an agreement and is of an individual nature. At the same time, the expenses of the territorial grid organization for paying for the services provided in accordance with the specified agreement are included in economically justified expenses taken into account when setting the tariff for electric energy transmission services for other consumers of its services, and the income of the other party to the specified agreement from the services provided by it under this agreement and income from services for the transmission of electrical energy provided to other consumers, must in total provide the necessary gross proceeds of this organization.

III. The order of access to electric networks in conditions of their limited capacity

30. When connecting to the electrical network and concluding an agreement, any consumer of services is assigned the right to receive electric energy at any time during the validity of the agreement within the limits of the connected capacity determined by the agreement, the quality and parameters of which must comply with technical regulations and other mandatory requirements.

When accessing services for the transmission of electrical energy in conditions of limited capacity of electrical networks, the possibility of charging an additional fee is excluded.

31. Restriction of the right to receive electrical energy is possible only in the event of a deviation from the normal modes of operation of the electrical network, caused by emergency situations and (or) withdrawal of electric power facilities for repair or out of operation and leading to a shortage of power.

At the same time, the limitation of the consumption of electrical energy is carried out in accordance with the acts of harmonization of emergency and technological armor.

32. The transmission capacity of the electric grid is determined according to the design scheme of the Unified Energy System of Russia, developed by the system operator together with the organization for managing the unified national (all-Russian) electric grid, taking into account the predicted balances of electric energy and capacity. When making such calculations, repair schedules for the main generating equipment (agreed with generating companies), equipment for electrical substations and power lines, power receiving equipment for consumers of electrical energy with a controlled load are also taken into account.

The system operator and the organization for managing the unified national (all-Russian) electric grid communicate to market participants information about the restrictions on the transmission capacity of the electric network, including the results of these calculations.

IV. The procedure for setting tariffs for services for the transmission of electrical energy, which provides for taking into account the degree of use of the power of the electrical network

33. Tariffs for electric power transmission services are established taking into account the use by consumers of the indicated services of the capacity of the electric network to which they are directly technologically connected.

34. The consumer of services must notify the grid organization at least 6 months before the next tariff regulation period of the amount of declared capacity for the coming calendar year, which reflects the degree of use of the electric network capacity by the consumer of services.

The value of the declared capacity is determined in relation to each connection point and cannot exceed the maximum connected capacity at the corresponding point of connection to the network of this consumer of services.

In the absence of the specified notification on the amount of the declared capacity, when setting tariffs, the value of the maximum connected capacity of the power receiving device (power plant) of the consumer of services is taken.

When determining the base for setting tariffs for the next regulation period, the grid organization has the right to use, in relation to consumers of services that systematically exceed the amount of declared capacity, the amount of capacity declared by the consumer for the next regulation period or the actual amount of used capacity over the past period.

35. Tariffs for electric power transmission services are established in accordance with the pricing principles for electric and thermal energy in the Russian Federation and the rules of state regulation and application of tariffs for electric and thermal energy in the Russian Federation, taking into account paragraph 34 of these Rules.

Accounting for the degree of use of the capacity of the electrical network when determining the tariff for services for the transmission of electrical energy is carried out in accordance with the methodological guidelines approved by the federal executive authority for tariffs.

V. The procedure for determining losses in electrical networks and paying for these losses

36. Actual losses of electrical energy in electrical networks are defined as the difference between the volume of electrical energy supplied to the electrical network from other networks or from electrical energy producers and the volume of electrical energy consumed by power receiving devices connected to this network, as well as transferred to other network organizations.

37. Grid organizations are obliged to compensate for the actual losses of electric energy that have arisen in the objects of the network economy belonging to them, minus the losses included in the price of electric energy.

38. Consumers of services, with the exception of electricity producers, are obliged to pay, as part of the payment for services for the transmission of electrical energy, the standard losses arising from the transmission of electrical energy through the network of a grid organization with which the relevant persons have concluded an agreement, with the exception of losses included in the price (tariff) for electricity, in order to avoid their double counting. Consumers of services pay for losses of electric energy in excess of the norm if it is proved that the losses arose due to the fault of these consumers of services.

39. The amount of losses of electrical energy in electrical networks, which is part of the payment for services for the transmission of electrical energy, is determined on the basis of the standard for losses of electrical energy. Loss standards are established by the authorized federal executive body in accordance with these Rules and the methodology for determining the normative and actual losses of electrical energy in electrical networks.

40. Standards for losses of electrical energy in electrical networks are established in relation to the totality of power transmission lines and other objects of the electrical network economy owned by the relevant grid organization, taking into account the differentiation by voltage levels of the networks when setting tariffs for services for the transmission of electrical energy.

41. The methodology for determining the normative and actual losses of electrical energy in electrical networks should provide for the calculation of losses based on:

technical characteristics of power transmission lines and other electric grid facilities that determine the amount of variable losses in accordance with the technology of transmission and conversion of electrical energy;

normative conditionally constant losses for power lines, power transformers and other electric grid facilities;

normative losses in the means of measuring electrical energy.

When setting standards, the technical condition of power lines and other electric grid facilities may also be taken into account.

42. The organization managing the unified national (all-Russian) electrical grid purchases electrical energy in order to compensate for losses in its networks on the wholesale electrical energy market.

Territorial grid organizations and other owners of electric grid facilities included in the unified national (all-Russian) electric grid, if they are not subjects of the wholesale electric energy (capacity) market, buy electric energy in order to compensate for losses in their networks on the retail electric power market. energy under a contract for the sale (supply) of electrical energy, concluded with a supplier of last resort (energy sales organization) operating in the territory where the relevant electrical networks are located.

(As amended by Decree of the Government of the Russian Federation of 31.08.2006 N 530)

VI. The procedure for the provision and disclosure by grid organizations of information on the capacity of electric networks, on their technical characteristics and on the cost of services for the transmission of electric energy

43. Information on the transmission capacity of electric networks and on their technical characteristics shall be disclosed by the grid organization in accordance with the standards for disclosure of information by subjects of the wholesale and retail electric energy markets.

44. The grid organization discloses information on the technical characteristics of electric networks on a quarterly basis no later than 30 business days from the date of the end of the quarter.

45. Information on the availability of transmission capacity of electrical networks and on the cost of services for the transmission of electrical energy, the grid organization is obliged to provide upon request (in writing) of the consumer of services.

46. ​​The requested information shall be provided within 7 days from the date of receipt of the request with reimbursement by the consumer of services for the costs of its provision, actually incurred by the grid organization.

47. Documents containing the requested information must be drawn up in the prescribed manner by network organizations.

48. The grid organization is responsible for the timeliness, completeness and reliability of the information provided and disclosed in the manner prescribed by the legislation of the Russian Federation.

VII. The procedure for considering applications (complaints) on issues of providing access to services for the transmission of electric energy and making decisions on these applications (complaints) that are binding on legal entities and individuals

49. The grounds for initiating and considering cases on issues of providing access to electricity transmission services, making decisions and issuing orders by the antimonopoly authority are statements by state authorities or statements (complaints) of legal entities and individuals.

50. The application (complaint) must contain information about the applicant and the person in respect of whom the application (complaint) is filed, a description of the violation of the requirements of these Rules, as well as the requirements with which the applicant applies.

51. The antimonopoly body considers the application (complaint) within one month from the date of its receipt.

If there is insufficient or no evidence to conclude that there are or are no signs of violation of the requirements of these Rules, the antimonopoly body has the right to extend the period for consideration of the application (complaint) up to 3 months from the date of its receipt in order to collect and analyze additional evidence. The antimonopoly body shall be obliged to notify the applicant in writing of the extension of the term for consideration of an application (complaint).

52. If there are no signs of violation of the requirements of these Rules and the antimonopoly legislation, the antimonopoly body shall notify the applicant in writing within 10 days from the date of the decision.

53. Cases of violations of the antimonopoly legislation are considered by the antimonopoly body in accordance with the legislation of the Russian Federation.

54. Consideration of cases of violations of the requirements of these Rules in terms of providing access to services for the transmission of electric energy and antimonopoly legislation and the adoption of decisions (orders) on them are carried out in the manner established by the federal antimonopoly body.

55. Federal executive authorities, executive authorities of the constituent entities of the Russian Federation, local governments, other bodies or organizations (their officials) endowed with the functions or rights of these authorities, commercial and non-profit organizations (their heads), individuals, including including individual entrepreneurs, have the right to appeal against decisions and orders in whole or in part of the antimonopoly body in the manner prescribed by the legislation of the Russian Federation.

APPROVED
Government Decree
Russian Federation
December 27, 2004
No. 861

RULES FOR NON-DISCRIMINATION ACCESS TO OPERATIONAL AND DISPATCH MANAGEMENT SERVICES IN THE ELECTRIC POWER INDUSTRY AND PROVISION OF THESE SERVICES

1. These Rules define the general principles and procedure for ensuring non-discriminatory access of subjects of the electric power industry (hereinafter referred to as consumers of services) to services for operational dispatch control in the electric power industry (hereinafter referred to as services) provided by the system operator and other subjects of operational dispatch control (hereinafter referred to as the system operator ), as well as the procedure for the provision of these services.

2. These Rules do not apply to relations related to the provision of services by subordinate entities of operational dispatch control in the electric power industry to higher entities of operational dispatch control in the electric power industry.

3. Non-discriminatory access to services provides for equal conditions for the provision of services to their consumers, regardless of their organizational and legal form and legal relations with the person providing these services.

4. The system operator is obliged to disclose information regarding access to services and the provision of services in accordance with the standards for information disclosure by subjects of the wholesale and retail electricity markets.

5. The system operator provides the following services:

a) management of technological modes of operation of electric power facilities;

b) medium-term and long-term forecasting of the volume of production and consumption of electrical energy;

c) participation in the formation of a reserve of production energy capacities;

d) coordinating the decommissioning and decommissioning of electric grid facilities and power facilities for the production of electrical and thermal energy, as well as putting them into operation after repair;

e) development of daily schedules for the operation of power plants and electrical networks of the Unified Energy System of Russia;

f) regulation of the frequency of electric current, ensuring the functioning of the system for automatic regulation of the frequency of electric current and power, ensuring the functioning of system and emergency automation;

g) organization and management of parallel operation modes of the Unified Energy System of Russia and electric power systems of foreign states;

h) participation in the formation and issuance of technological requirements for the technological connection of electric power industry entities to the unified national (all-Russian) electric grid and territorial distribution networks that ensure their operation as part of the Unified Energy System of Russia.

6. Services are provided on the basis of a bilateral agreement on the provision of services for operational dispatch control in the electric power industry (hereinafter referred to as the agreement), as well as on the basis of an agreement on joining the trading system of the wholesale electricity market.

7. The consumer of services may simultaneously be a party to the agreements specified in paragraph 6 of these Rules only under the following conditions:

the provisions of these contracts relating to the provision of services are fully the same;

the total cost of services rendered on the basis of these contracts is determined by the tariffs established by the federal executive authority for tariffs.

8. The conclusion of an agreement between the consumer of services and the system operator is mandatory for both parties.

9. Wholesale market entities enter into an agreement with the system operator before they conclude an agreement with the organization managing the unified national (all-Russian) electric grid on the provision of services for the transmission of electric energy through the unified national (all-Russian) electric grid.

10. The price of services is determined by the tariffs established by the federal executive authority on tariffs.

11. The consumer of services who intends to conclude an agreement (hereinafter referred to as the applicant) sends to the system operator an application in writing for providing access to services, which must contain the following information:

details of the consumer of services;

points of connection to networks of the network organization;

service start dates.

The applicant simultaneously with the application has the right to send the draft contract to the system operator.

12. The system operator, within 30 days from the date of receipt of an application for providing access to services, is obliged to consider it and make a decision on granting access to services or refusing it.

13. In the absence of the information specified in paragraph 11 of these Rules, the system operator notifies the applicant about this within 3 days and, within 30 days from the date of receipt of the missing information, considers the application for providing access to services in accordance with paragraph 12 of these Rules.

14. If a decision is made to provide access to services, the system operator is obliged to send the applicant a draft agreement signed on its part.

15. An applicant who has received a signed draft agreement from the system operator and has no objections to its terms, fills out the agreement in the part related to information about the applicant, and sends 1 signed copy of the agreement to the system operator.

16. If the applicant submitted a draft agreement, and the system operator has no objections to its terms, the latter is obliged to sign it and send 1 signed copy of the agreement to the applicant.

The contract is considered concluded from the date of its signing by both parties, unless otherwise provided by this contract or a court decision.

17. If a decision is made to refuse to provide access to services, the system operator is obliged to send the applicant a written notice and supporting documents no later than 10 days from the date of receipt of the application specified in paragraph 11 of these Rules.

Refusal to provide access to services may be appealed to the antimonopoly body and (or) challenged in court.

18. The system operator has the right to refuse to provide access to services in the following cases:

a) the applicant did not provide the information provided for in paragraph 11 of these Rules;

b) the applicant provided false information;

c) the applicant's energy facilities are located outside the zone of his dispatching responsibility.

In this case, the applicant has the right to re-apply to the system operator with an application for providing access to services. When the grounds for refusal are eliminated, the system operator is not entitled to refuse the applicant to provide access to services.

19. The provision of services is carried out in order to ensure reliable energy supply and quality of electric energy that meet the requirements of technical regulations and other mandatory requirements established by regulatory legal acts, and to take measures to ensure the fulfillment of obligations of electric power industry entities under contracts concluded on the wholesale and retail electric energy markets.

As part of the provision of services, the system operator is obliged to choose the most cost-effective solution that ensures the safe and trouble-free operation of the technological infrastructure of the electric power industry and the quality of electric energy that meets the requirements of technical regulations and other mandatory requirements.

20. Consumers of services have the right not to execute operational dispatching commands and orders if their execution poses a threat to human life, safety of equipment or leads to violation of the limits and conditions for the safe operation of nuclear power plants.

21. In the event of emergency electric power modes, the provision of services is carried out taking into account the specifics established by the legislation of the Russian Federation.

APPROVED
Government Decree
Russian Federation
December 27, 2004
No. 861

RULES OF NON-DISCRIMINATION ACCESS TO THE SERVICES OF THE ADMINISTRATOR OF THE WHOLESALE MARKET TRADING SYSTEM AND PROVISION OF THESE SERVICES

1. These Rules define the general principles and procedure for ensuring non-discriminatory access of the subjects of the wholesale electricity (capacity) market (hereinafter referred to as the wholesale market entities) to services for organizing the functioning of the trading system of the wholesale electricity (capacity) market, organizing wholesale trade in electricity and conducting reconciliation and offset of mutual counter obligations of trade participants (hereinafter - services) of the wholesale market trading system administrator (hereinafter - administrator), as well as the procedure for providing these services.

2. Non-discriminatory access to the administrator's services provides for the provision of equal conditions for the provision of services to subjects of the wholesale market, regardless of their organizational and legal form and legal relations with the person providing these services.

3. The administrator is obliged to disclose information regarding access to services and their provision, in accordance with the standards for information disclosure by subjects of the wholesale and retail electricity markets.

4. The administrator is not entitled to refuse to provide services to wholesale market entities, except for the cases established by these Rules and the rules of the wholesale electricity market.

5. Administrator services can be provided to persons:

included in the list of commercial organizations - subjects of the federal (all-Russian) wholesale electricity (capacity) market, the tariffs for electricity for which are set by the federal executive authority on tariffs, until the rules of the wholesale electricity market come into force;

who have received the status of a wholesale market entity in accordance with the rules of the wholesale electricity market by providing the administrator with the documents and information specified in these Rules, and signing by the wholesale market entities of an agreement on joining the trading system of the wholesale electricity (capacity) market.

6. A legal entity wishing to gain access to the administrator's services (hereinafter referred to as the applicant) is obliged to submit an application for this and submit the following documents to the administrator:

information on the type of wholesale market entity (generating company, energy sales organization, energy supply organization, guaranteeing supplier, consumer of electric energy, etc.), to which the applicant corresponds, in accordance with the rules of the wholesale electricity (capacity) market of the transitional period;

signed by an authorized person of the applicant 5 copies of the draft agreement on joining the trading system of the wholesale electricity (capacity) market in the form approved by the administrator;

the applicant's questionnaire in the prescribed form;

notarized copies of constituent documents;

a notarized copy of the certificate of state registration of a legal entity;

a notarized copy of the certificate of the applicant's registration with the tax authorities of the Russian Federation;

documents confirming the authority of persons representing the interests of the applicant;

a document confirming that the organization has been granted the status of a supplier of last resort in the cases and in the manner established by the legislation of the Russian Federation;

a single-line diagram of connection to an external electrical network, agreed with the owner or other legal owner of the network facilities to which the applicant or third parties whose interests he represents are technologically connected, indicating the names and voltage levels of the buses of external substations, the proposed groups of supply points, places for connecting devices commercial accounting, measuring voltage transformers and the boundaries of the balance sheet, certified by representatives of adjacent owners of electrical networks;

acts of delimitation of balance sheet ownership and operational responsibility, agreed with the owners or other legal owners of grid facilities to which the applicant is technologically connected or third parties whose interests the applicant intends to represent.

The applicant, who has the right to purchase and sell electricity (capacity) in the regulated sector, is obliged to submit to the administrator a document confirming the inclusion of the legal entity in the list of commercial organizations - subjects of the federal (all-Russian) wholesale electricity (capacity) market, for which electricity tariffs are established by the federal executive authority on tariffs.

In order to confirm the compliance of the generating and power receiving equipment with the quantitative characteristics presented to the objects participating in the wholesale electricity market, the applicant submits to the administrator the passport technological characteristics of the specified equipment.

7. The applicant representing the interests of third parties in the wholesale electricity (capacity) market shall submit to the administrator information on the technological characteristics of the generating equipment of the suppliers whose interests he represents, and (or) the technological characteristics of the energy receiving equipment of the consumers whose interests he represents.

The applicant, carrying out activities for the transmission of electrical energy and buying electrical energy on the wholesale market of electrical energy (capacity), in order to compensate for losses in electrical networks, submits to the administrator the characteristics of the electrical network and network facilities for each group of supply points (grid facility).

In order to obtain data on the actual production and consumption of energy, as well as to carry out settlements on the wholesale electricity (capacity) market, the applicant shall submit documents confirming the compliance of the commercial metering system with the mandatory technical requirements and conditions of the agreement on joining the trading system of the wholesale electricity (capacity) market ), in the order determined by the administrator.

All documents must be submitted by the applicant in accordance with the requirements determined by the administrator.

The administrator is not entitled to require the submission of information not provided for by these Rules, unless otherwise provided by the legislation of the Russian Federation.

In order to ensure equal access to the services of the administrator, the owner or other legal owner of the network facilities to which the applicant is technologically connected or third parties whose interests he represents, is obliged to ensure the coordination of the single-line connection scheme to the external electrical network and draw up acts of delimitation of the balance sheet of responsibility.

8. The administrator has the right to refuse access to the services of the administrator, if the applicant:

a) did not submit the documents and information provided for in paragraph 6 of these Rules;

b) provided false information;

c) does not comply with any of the requirements established by the legislation of the Russian Federation for wholesale market entities.

The applicant has the right to re-apply to the administrator with an application for granting access to the administrator's services when the grounds for denying the applicant access to the administrator's services are eliminated.

9. The decision to refuse access to the administrator's services may be appealed in the manner prescribed by the legislation of the Russian Federation.

10. The administrator provides services to wholesale market entities on the basis of an agreement on joining the trading system of the wholesale electricity market.

A signed copy of the agreement on joining the trading system of the wholesale electricity (capacity) market is sent by the administrator to the wholesale market entity.

11. Administrator's services are paid by the wholesale market entity at the tariffs approved by the federal executive authority on tariffs.

12. If the wholesale market entity fails to pay for the services of the administrator, the administrator has the right to suspend the acceptance of applications from the wholesale market entity for participation in the competitive selection of price bids in the free trade sector of the wholesale market until the debt is fully repaid.

13. The administrator has the right to terminate the provision of services to the wholesale market entity in the event of:

non-compliance of the legal entity with the requirements for the wholesale market entity;

loss by a legal entity of the status of a wholesale market entity;

repeated non-fulfillment or improper fulfillment by the wholesale market entity of obligations to pay for the services of the administrator;

termination of the agreement on accession to the trading system of the wholesale market;

termination of the activities of the wholesale market entity on the grounds provided for by the legislation of the Russian Federation.

14. Adoption by the administrator in accordance with the rules of the wholesale electricity (capacity) market of the transitional period and the agreement on joining the trading system of the wholesale electricity market of a decision to recognize the sale (purchase) of electricity in the free trade sector as a whole or in any limited territory not taken place cannot be considered as non-fulfillment or improper fulfillment of obligations for the provision of administrator services.

APPROVED
Government Decree
Russian Federation
December 27, 2004
No. 861

RULES FOR TECHNOLOGICAL CONNECTION OF POWER RECEIVING DEVICES (POWER INSTALLATIONS) OF LEGAL ENTITIES AND INDIVIDUALS TO ELECTRIC NETWORKS

(As amended by Decree of the Government of the Russian Federation of 31.08.2006 N 530)

I. General provisions

1. These Rules determine the procedure for technological connection of power receiving devices (power installations) of legal entities and individuals (hereinafter referred to as power receiving devices), regulate the procedure for technological connection, determine the essential terms of the agreement on technological connection to electric networks (hereinafter referred to as the contract), establish requirements for issuance of individual technical conditions for connection to electric networks (hereinafter referred to as technical conditions) and criteria for the presence (absence) of the technical possibility of technological connection.

2. These Rules apply to persons whose power receiving devices were previously connected to the electrical network and who declared the need to revise (increase) the amount of connected power.

3. The grid organization is obliged to carry out, in relation to any person who applies to it, measures for technological connection of newly commissioned, newly built, expanding their previously connected capacity and reconstructed power receiving devices to their electric networks (hereinafter referred to as technological connection), subject to their compliance with these Rules and availability of technical feasibility of technological connection.

In relation to power receiving devices technologically connected to the electrical network before the entry into force of these Rules, the contract is not concluded and the measures specified in paragraph 12 of these Rules are not performed.

4. Any persons have the right to technological connection of power transmission lines built by them to electric networks in accordance with these Rules.

5. When connecting power plants to the power plant switchgears, the latter performs the functions of a grid organization in terms of carrying out activities under the contract.

6. Technological connection is carried out on the basis of an agreement concluded with a grid organization within the time limits established by these Rules. The conclusion of the contract is obligatory for the network organization. In the event of an unjustified refusal or evasion of a grid organization from concluding a contract, the interested person has the right to apply to the court with a claim for compulsion to conclude a contract and recovery of losses caused by such unjustified refusal or evasion.

7. These Rules establish the following procedure for technological connection:

filing an application for technological connection with the requirement to issue technical conditions;

preparation of technical specifications and submission of a draft agreement, including technical specifications;

conclusion of an agreement;

fulfillment of technical conditions by the affiliated person and by the grid organization;

performing actions to connect and ensure the operation of the power receiving device in the electrical network;

verification of compliance with technical conditions and drawing up an act on technological connection.

II. The procedure for concluding and fulfilling the contract

8. In order to obtain technical conditions and carry out technological connection, the person who owns the power receiving device sends an application for technological connection (hereinafter referred to as the application) to the grid organization, to the electrical network of which technological connection is planned.

9. The application must contain the following information:

a) full name of the applicant;

b) the location of the applicant;

c) the postal address of the applicant;

d) location plan of the power receiving device, in respect of which it is planned to carry out measures for technological connection;

e) the maximum power of the power receiving device and its technical characteristics, the number, power of generators and transformers connected to the network;

f) the number of points of connection to the electrical network, indicating the technical parameters of the elements of electrical installations connected at specific points of the electrical network;

g) a single-line diagram of the applicant's electrical networks connected to the networks of the grid organization, indicating the possibility of redundancy from its own power supply sources (including redundancy of own needs) and the possibility of switching loads (generation) through the applicant's internal networks;

h) the declared level of reliability of the power receiving device;

i) the nature of the load of the consumer of electrical energy (for generators - the possible speed of increasing or decreasing the load) and the presence of loads that distort the shape of the electric current curve and cause voltage asymmetry at the connection points;

j) the value and justification of the value of the technological minimum (for generators) and emergency armor (for consumers of electrical energy);

k) permission of the authorized body of state supervision for admission to operation of the power receiving device (with the exception of facilities under construction);

l) the scope of possible participation in automatic or operational emergency control of power (for power plants and consumers, with the exception of individuals) in the procedure for the provision of services in accordance with a separate agreement;

m) the scope of possible participation in the normalized primary frequency regulation and in the secondary power regulation (for power plants) in the procedure for the provision of services in accordance with a separate agreement;

n) the list and power of the current collectors of the consumer (with the exception of individuals), which can be turned off using an emergency automatic device.

The list of information specified in the application is exhaustive.

The grid organization is not entitled to require the submission of information not provided for by these Rules.

10. The grid organization is obliged to send the draft contract to the applicant for approval within 30 days from the date of receipt of the application.

In the absence of the information specified in clause 9 of these Rules, or if they are incomplete, the grid organization notifies the applicant about this within 6 working days and considers the application within 30 days from the date of receipt of the missing information.

In the case of a particularly complex nature of the technological connection of power receiving devices for an organization managing a unified national (all-Russian) electric grid or other owners of objects of such a network, the specified period, by agreement of the parties, can be extended to 90 days. The applicant is notified of the extension of the term and the grounds for its change.

11. The contract must contain the following essential conditions: measures for technological connection and obligations of the parties for their implementation;

fulfillment of technical conditions;

deadlines for the implementation by the network organization of measures for technological connection;

the amount of payment for the implementation of measures for technological connection;

the responsibility of the parties for the fulfillment of the terms of the contract;

boundaries of delimitation of balance sheet ownership.

12. Measures for technological connection include:

a) development of a power supply scheme;

b) technical inspection (survey) of connected power receiving devices by an authorized state authority with the participation of representatives of the grid organization;

c) preparation and issuance of technical specifications;

d) fulfillment of technical conditions (on the part of the person whose power receiving device is connected, and on the part of the grid organization), including the implementation by the grid organization of measures to equip power receiving devices with relay protection devices, emergency and regime automation in accordance with the technical specifications;

(As amended by Decree of the Government of the Russian Federation of 31.08.2006 N 530)

e) actual actions to connect and ensure the operation of the power receiving device in the electrical network;

f) verification of compliance with technical conditions and drawing up an act on technological connection.

The list of measures for technological connection is exhaustive.

It is prohibited to impose on a person interested in technological connection services that are not provided for by these Rules.

13. The grid organization is obliged, within 30 days from the date of receipt of the application, to consider it, prepare technical conditions for technological connection and coordinate them with the system operator (subject of operational dispatch control), and the organization managing the unified national (all-Russian) electric grid or other owners objects of such a network in the cases provided for in paragraph three of clause 10 of these Rules - within 90 days.

The grid organization is obliged, within 5 days from the date of receipt of the application, to send a copy of it for consideration by the system operator (subject of operational dispatch control), and then, together with him, consider it and prepare technical conditions for technological connection.

14. Technical conditions for technological connection are an integral part of the contract.

The specifications must include:

a) schemes for the issuance or reception of power and points of connection to the electrical network (power lines or base substations);

b) justified requirements for strengthening the existing electrical network in connection with the connection of new capacities (construction of new power lines, substations, increase in the cross-section of wires and cables, increase in the power of transformers, expansion of switchgears, installation of compensating devices to ensure the quality of electricity);

c) design values ​​of short-circuit currents, requirements for relay protection, voltage regulation, emergency automation, telemechanics, communications, isolation and overvoltage protection, as well as for electrical energy and power meters in accordance with the requirements established by regulatory legal acts;

d) requirements for equipping power plants with emergency control devices for issuing its power and for equipping consumers with emergency control devices;

e) requirements for equipping with devices that ensure the participation of power plants or the consumer in automatic or operational emergency control of power in the manner of rendering services in accordance with a separate agreement;

f) requirements for equipping with devices that ensure the participation of power plants in the normalized primary frequency control and in the secondary power control in the order of the provision of services in accordance with a separate agreement;

g) requirements for equipping power receiving devices with relay protection devices, emergency and regime automation, including the placement of devices that provide remote input of temporary shutdown schedules for consumption from dispatch centers in accordance with the requirements of the relevant subject of operational dispatch control.

(As amended by Decree of the Government of the Russian Federation of 31.08.2006 N 530)

III. Criteria for the presence (absence) of the technical possibility of technological connection

15. The criteria for the availability of technical feasibility of technological connection are:

a) location of the power receiving device, in respect of which an application for technological connection has been submitted, within the territorial boundaries of the service of the relevant grid organization;

b) the absence of restrictions on the connected capacity in the network node to which technological connection is to be made.

In case of non-compliance with any of the specified criteria, there is no technical possibility of technological connection.

In order to verify the validity of the establishment by the grid organization of the fact of the lack of technical capability, the applicant has the right to apply to the authorized federal executive body for technological supervision to obtain an opinion on the presence (absence) of the technical capability of technological connection by the grid organization.

16. Restrictions on the connection of additional power arise if the full use of the consumed (generating) power of all previously connected consumers of electric power transmission services and the power of a newly connected power receiving device can lead to loading the power equipment of a grid organization in excess of the values ​​determined by technical standards and standards approved or adopted in the manner prescribed by the legislation of the Russian Federation.

17. If there is a restriction on the connection of new power, it is allowed to connect power receiving devices to electric networks within the power value that does not cause restrictions on the use of consumed (generating) power of all consumers of electric energy previously connected to this network node, or in the declared volume in agreement with the specified consumers.

The Zakonbase website submits the Decree of the Government of the Russian Federation of December 27, 2004 N 861 (as amended on 31.08.2006) "On approval of the rules of non-discriminatory access to the services for transmitting electric energy and the provision of these services, the rules of non-discriminatory access to the services for operational dispatch management In the electric power industry and the provision of these services, the rules of non -discriminatory access to the services of the administrator of the wholesale market and the provision of these services and the rules of technological connection of energy acceptance devices (energy plants) of legal entities and individuals to electric networks in the latest version. It is easy to comply with all legal requirements if you familiarize yourself with the relevant sections, chapters and articles of this document for 2014. To search for the necessary legislative acts on a topic of interest, you should use convenient navigation or advanced search.

On the website "Zakonbase" you will find the REGULATION of the Government of the Russian Federation dated December 27, 2004 N 861 (as amended on August 31, 2006) "ON APPROVAL OF THE RULES OF NON-DISCRIMINATION ACCESS TO ELECTRICITY TRANSMISSION SERVICES AND THE PROVISION OF THESE SERVICES, RULES OF NON-DISCRIMINATION ACCESS TO Management in the electric power industry and the provision of these services, the rules of non -discriminatory access to the services of the administrator of the wholesale market and the provision of these services and the rules of technological connection of energy acceptance devices (energy plants) of legal entities and individuals to electric networks "in the fresh and full version, in which everything is entered changes and amendments. This guarantees the relevance and reliability of the information.

At the same time, download the Decree of the Government of the Russian Federation of December 27, 2004 N 861 (as amended on 31.08.2006) "On the approval of the rules of non-discriminatory access to the services for transmitting electric energy and the provision of these services, the rules of non-discriminatory access to the services for operational dispatch management and The provision of these services, the rules of non -discriminatory access to the services of the administrator of the wholesale market and the provision of these services and the rules of technological connection of power receiving devices (power plants) of legal entities and individuals to electric networks can be completely free of charge, both in full and individual chapters.